✨ Electricity Reliability Statistics




FIRST SCHEDULE - PART IV continued
Reliability Performance Measures continued

CAIDI (Electricity Customer Average Interruption Duration Index)

1998 1997 1996 1995
9. The CAIDI for the total interruptions 89.37 56.39 61.91 70.72
  1. The CAIDI for the total interruptions within each interruption class
1998 1997 1996 1995
Class A Planned Trans Power interruption - - - -
Class B Planned interruption by a Line Operator (other than Trans Power) 239.37 56.82 133.80 120.39
Class C Unplanned interruption originating within the principal Line Owners works 75.22 58.81 54.27 63.11
Class D Unplanned Trans Power interruption - 45.11 103.40 25.45
Class E Unplanned ECNZ interruption - - - -
Class F Unplanned interruption originating from a generator other than ECNZ - - - -
Class G Other - - - -

28 SEPTEMBER
NEW ZEALAND GAZETTE
3867



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 160


NZLII PDF NZ Gazette 1998, No 160





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures for Electricity Interruptions (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Faults, Reliability, Performance Measures, Statistics, CAIDI, Interruption Duration