β¨ Energy Reliability Statistics
25 SEPTEMBER NEW ZEALAND GAZETTE 3831
WESTPOWER LIMITED
SYSTEM RELIABILITY
Disclosure by line owners of reliability performance measures
as required by Regulation 16 of the Electricity (Information Disclosure) Regulations 1994
Part IV 1. of the first schedule
Total number of interruptions,
together with a breakdown of that total according
to interruption class
| Year ended 31-Mar-98 | Year ended 31-Mar-97 | Year ended 31-Mar-96 | Year ended 31-Mar-95 | |
|---|---|---|---|---|
| Class A - Planned interruptions caused by Trans Power | 3 | 1 | 0 | 0 |
| Class B - Planned interruptions by Westpower | 126 | 88 | 71 | 98 |
| Class C - Unplanned interruptions by Westpower | 91 | 89 | 135 | 220 |
| Class D - Unplanned interruptions caused by Trans Power | 4 | 5 | 6 | 10 |
| Class E - Unplanned interruptions caused by ECNZ generation | 0 | 0 | 0 | 0 |
| Class F - Unplanned interruptions caused by Westpower generation | 1 | 0 | 10 | 8 |
| Class G - Other interruptions (Planned Westpower generation) | 1 | 0 | 0 | 0 |
| Total interruptions | 226 | 183 | 222 | 336 |
Part IV 2. of the first schedule
The total number of faults per 100 circuit kilometres of prescribed voltage electric line
(Voltage equal to or greater than 3.3 kilovolts)
| 5.67 | 10.71 | 8.50 | 12.50 | |
|---|---|---|---|---|
| Total faults per 100 km | 5.67 | 10.71 | 8.50 | 12.50 |
Part IV 3. of the first schedule
Total number of faults per 100 kilometres of underground prescribed voltage electric line
| Nominal Line Voltage | ||||
|---|---|---|---|---|
| 66kv / 50kv | 0.00 | 0.00 | 0.00 | 0.00 |
| 33kV | 0.00 | 0.00 | 0.00 | 0.00 |
| 11kV | 0.00 | 3.53 | 18.20 | 17.70 |
| Total faults per 100 km | 0.00 | 3.49 | 18.00 | 17.50 |
Part IV 4. of the first schedule
Total number of faults per 100 kilometres of overhead prescribed voltage electric line
| 66kv / 50kv | 12.67 | 21.04 | 25.21 | 16.83 |
| 33kV | 6.42 | 3.17 | 7.09 | 8.37 |
| 11kV | 5.35 | 11.39 | 8.21 | 12.65 |
| Total faults per 100 km | 5.67 | 10.70 | 8.34 | 12.42 |
Part IV 5. of the first schedule
| The SAIDI for the total number of interruptions | 384.22 | 435.90 | 835.42 | 646.7 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 159
NZLII —
NZ Gazette 1998, No 159
β¨ LLM interpretation of page content
π
Westpower Limited System Reliability
(continued from previous page)
π Trade, Customs & IndustryReliability, Performance Measures, Electricity, Statistics, Westpower Limited