β¨ Electricity Efficiency Performance Measures
NEW ZEALAND GAZETTE
No. 149
EFFICIENCY PERFORMANCE MEASURES AND STATISTICS (REGULATION 15)
| 1998 | 1997 | 1996 | 1995 |
|---|
DELIVERY EFFICIENCY PERFORMANCE MEASURES
(A) Load Factor
Electrical energy entering the system as a percentage of maximum demand times hours per year.
57% | 53% | 53% | 53%
(B) Loss Ratio
System losses as a percentage of energy entering the system.
5.9% | 5.6% | 6.1% | 5.9%
(C) Capacity Utilisation
Maximum demand as a percentage of total transformer capacity.
36.6% | 40.0% | 40.6% | 39.8%
STATISTICS
Distribution transformer capacity (MVA)
483 | 479 | 473 | 467
Maximum demand (MW)
191 | 191 | 192 | 186
Total electricity supplied from the system (GWh)
838 | 838 | 836 | 808
Total electricity conveyed for unrelated parties (GWh)
63 | 63 | 119 | 126
Number of network connections
49,864 | 49,864 | 49,784 | 49,390
Line business ODV at 31 March ($million)
$80.70 | $80.70 | $85.60 | $85.60
System length, by voltage:
| Total km | Overhead km | Underground km | ||||
|---|---|---|---|---|---|---|
| 1998 | 1997 | 1996 | 1995 | 1998 | 1997 | |
| ---------- | ------ | ------ | ------ | ------ | ------ | ------ |
| 600V DC | 4.1 | 4.1 | 4.1 | 4.1 | 0.9 | 0.9 |
| 400V | 727 | 727 | 726 | 723 | 629 | 629 |
| 6.6 kV | 720 | 720 | 716 | 711 | 489 | 489 |
| 11 kV | 257 | 257 | 256 | 255 | 237 | 237 |
| 33 kV | 225 | 225 | 225 | 225 | 150 | 150 |
| Total | 1,933 | 1,933 | 1,928 | 1,918 | 1,506 | 1,506 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 149
NZLII —
NZ Gazette 1998, No 149
β¨ LLM interpretation of page content
π
Financial Efficiency Performance Measures for Electricity Sector
(continued from previous page)
π Trade, Customs & IndustryFinancial Measures, Accounting Return, Efficiency, Electricity Sector, Profitability, Costs