✨ Electricity Efficiency Performance Measures




NEW ZEALAND GAZETTE

No. 149

EFFICIENCY PERFORMANCE MEASURES AND STATISTICS (REGULATION 15)

1998 1997 1996 1995

DELIVERY EFFICIENCY PERFORMANCE MEASURES

(A) Load Factor
Electrical energy entering the system as a percentage of maximum demand times hours per year.

57% | 53% | 53% | 53%

(B) Loss Ratio
System losses as a percentage of energy entering the system.

5.9% | 5.6% | 6.1% | 5.9%

(C) Capacity Utilisation
Maximum demand as a percentage of total transformer capacity.

36.6% | 40.0% | 40.6% | 39.8%

STATISTICS

Distribution transformer capacity (MVA)

483 | 479 | 473 | 467

Maximum demand (MW)

191 | 191 | 192 | 186

Total electricity supplied from the system (GWh)

838 | 838 | 836 | 808

Total electricity conveyed for unrelated parties (GWh)

63 | 63 | 119 | 126

Number of network connections

49,864 | 49,864 | 49,784 | 49,390

Line business ODV at 31 March ($million)

$80.70 | $80.70 | $85.60 | $85.60

System length, by voltage:

Total km Overhead km Underground km
1998 1997 1996 1995 1998 1997
---------- ------ ------ ------ ------ ------ ------
600V DC 4.1 4.1 4.1 4.1 0.9 0.9
400V 727 727 726 723 629 629
6.6 kV 720 720 716 711 489 489
11 kV 257 257 256 255 237 237
33 kV 225 225 225 225 150 150
Total 1,933 1,933 1,928 1,918 1,506 1,506


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 149


NZLII PDF NZ Gazette 1998, No 149





✨ LLM interpretation of page content

🏭 Financial Efficiency Performance Measures for Electricity Sector (continued from previous page)

🏭 Trade, Customs & Industry
Financial Measures, Accounting Return, Efficiency, Electricity Sector, Profitability, Costs