✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 147

TASMAN ENERGY

STATEMENT OF PERFORMANCE MEASURES

THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

FOR THE YEAR ENDING 31 MARCH 1998

CLASSIFICATION OF INTERRUPTIONS

1998 SAIDI Min/Con-Cust 1997 SAIDI Min/Con-Cust 1996 SAIDI Min/Con-Cust 1995 SAIDI Min/Con-Cust
Class A TransPower Planned 0 0 65.06 9
Class B Line Owner Planned 100.27 78.25 101.01 24
Class C Line Owner Unplanned 147.62 152.13 127.48 123
Class D TransPower Unplanned 44.33 1.1 25.82 61
Class E Unplanned ECNZ 0 0 0 0
Class F Unplanned Other Generator 0 0 0 0
Class G Other 0 0 0 0
Total 292.22 231.48 319.37 217
1998 SAIFI Int/Con-Cust 1997 SAIFI Int/Con-Cust 1996 SAIFI Int/Con-Cust 1995 SAIFI Int/Con-Cust
Class A TransPower Planned 0 0 0.204 0.05
Class B Line Owner Planned 0.76 0.64 0.667 0.14
Class C Line Owner Unplanned 2.02 2.03 1.369 1.3
Class D TransPower Unplanned 1.53 0.03 0.841 1.71
Class E Unplanned ECNZ 0 0 0 0
Class F Unplanned Other Generator 0 0 0 0
Class G Other 0 0 0 0
Total 4.31 2.7 3.081 3.2
1998 CAIDI Min/Cust-Int 1997 CAIDI Min/Cust-Int 1996 CAIDI Min/Cust-Int 1995 CAIDI Min/Cust-Int
Class A TransPower Planned 0 0 318.74 180
Class B Line Owner Planned 131.93 122.27 151.38 174
Class C Line Owner Unplanned 73.08 74.94 93.07 95
Class D TransPower Unplanned 28.97 36.67 30.69 36
Class E Unplanned ECNZ 0 0 0 0
Class F Unplanned Other Generator 0 0 0 0
Class G Other 0 0 0 0
Total 67.80 85.73 103.66 68

6. VALUATION OF ASSETS TO BE DISCLOSED BY LINE OWNERS

ODV of Line Owner Assets 31 March 1998

$93,417,000



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 147


NZLII PDF NZ Gazette 1998, No 147





✨ LLM interpretation of page content

🏭 Tasman Energy Limited Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Interruptions, Reliability, Faults, Statistics