✨ Financial Performance and Position of Wairoa Power Limited




Wairoa Power Limited - Lines Business

NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 31 MARCH 1998 continued

  1. RELIABILITY PERFORMANCE MEASURES (continued)
Interruption Class 1998* 1998 1997 1996 1995
A Planned Interruption by Transpower Number 5 5 2 0 2
SAIDI 31.5 31.5 26.9 0 56
SAIFI 0.32 0.32 0.24 0 0.50
CAIDI 99.9 99.9 112.0 0 115

| B Planned Interruption by Other Line Owner | Number | 47 | 47 | 43 | 25 | 34 |
| | SAIDI | 245.7 | 245.7 | 98.6 | 166 | 201 |
| | SAIFI | 2.09 | 2.09 | 0.93 | 1.04 | 1.20 |
| | CAIDI | 117.1 | 117.1 | 106.0 | 160 | 167 |

| C Unplanned Interruption by Other Line Owner | Number | 74 | 84 | 178 | 59 | 88 |
| | SAIDI | 277.3 | 989.7 | 748.0 | 499 | 1,081 |
| | SAIFI | 5.50 | 7.31 | 7.09 | 4.40 | 2.31 |
| | CAIDI | 50.4 | 135.4 | 105.5 | 115 | 469 |

| D Unplanned Interruption by Transpower | Number | 5 | 5 | 0 | 2 | 1 |
| | SAIDI | 157.4 | 157.4 | 0 | 57 | 0 |
| | SAIFI | 2.59 | 2.59 | 0 | 2.20 | 0.05 |
| | CAIDI | 60.8 | 60.8 | 0 | 1.00 | 1.00 |

| E Unplanned Interruption by ECNZ | Number | 0 | 0 | 0 | 1 | 0 |
| | SAIDI | 0 | 0 | 0 | 7 | 0 |
| | SAIFI | 0 | 0 | 0 | 1.00 | 0 |
| | CAIDI | 0 | 0 | 0 | 7 | 0 |

| F Unplanned Interruption by any other generator | Number | 0 | 0 | 0 | 0 | 0 |
| | SAIDI | 0 | 0 | 0 | 0 | 0 |
| | SAIFI | 0 | 0 | 0 | 0 | 0 |
| | CAIDI | 0 | 0 | 0 | 0 | 0 |

| G Unplanned Interruption not resulting from above | Number | 0 | 0 | 0 | 0 | 0 |
| | SAIDI | 0 | 0 | 0 | 0 | 0 |
| | SAIFI | 0 | 0 | 0 | 0 | 0 |
| | CAIDI | 0 | 0 | 0 | 0 | 0 |

| Total | Number | 131 | 141 | 223 | 87 | 125 |
| | SAIDI | 712 | 1,424 | 873 | 729 | 1,340 |
| | SAIFI | 10.50 | 12.31 | 8.26 | 8.60 | 4.06 |
| | CAIDI | 67.8 | 115.7 | 105.7 | 85 | 330 |

Wairoa Power Limited - Lines Business

NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 31 MARCH 1998 continued

SAIDI System Average Interruption Duration Index
(minutes per customer per year)

SAIFI System Average Interruption Frequency Index
(interruptions per customer per year)

CAIDI (minutes per customer interrupted)

  • Excludes data for Queens Birthday Storm

NEW ZEALAND GAZETTE

No. 141



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 141


NZLII PDF NZ Gazette 1998, No 141





✨ LLM interpretation of page content

🏭 Financial Performance and Position of Wairoa Power Limited (continued from previous page)

🏭 Trade, Customs & Industry
Financial Statements, Performance, Equity, Assets, Liabilities, Wairoa Power Limited, Statistics, Reliability Measures