Electricity Reliability Statistics




NEW ZEALAND GAZETTE

No. 123

PERFORMANCE MEASURES AND OTHER INFORMATION - PART IV

Regulation 16

Reliability Performance Measures to be Disclosed by Line

1995 1996 1997 1998
1 TOTAL NUMBER OF INTERRUPTIONS:
Class A 1 0 2 1
Class B 78 37 40 53
Class C 350 511 450 164
Class D 10 7 2 4
Class E 0 0 0 0
Class F 0 0 0 0
Class G 0 0 0 0
Total 439 555 494 222
1995 1996 1997 1998
2 TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM
Total 19 15 12 11
33kV 6 1 14 12
11kV 13 14 9 12
This breakdown is an estimate
1995 1996 1997 1998
3 TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM OF UNDERGROUND
Total 4 20 22 3
33kV 0 0 0 0
11kV 4 20 9 3
This breakdown is an estimate
1995 1996 1997 1998
4 TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM OF OVERHEAD
Total 16 19 14 12
33kV 3 2 14 12
11kV 13 17 9 12
This breakdown is an estimate

| 5 THE SAIDI FOR THE TOTAL NUMBER OF INTERRUPTIONS | 336 | 313 | 367 | 271 |

| 6 THE SAIDI FOR THE TOTAL NUMBER OF INTERRUPTIONS WITHIN EACH CLASS | | | | |
| Class A | 37 | 0 | 14 | 51 |
| Class B | 82 | 79 | 91 | 64 |
| Class C | 203 | 223 | 215 | 164 |
| Class D | 11 | 11 | 47 | 21 |
| Class E | 0 | 0 | 0 | 0 |
| Class F | 0 | 0 | 0 | 0 |
| Class G | 0 | 0 | 0 | 0 |

| 7 THE SAIFI FOR THE TOTAL NUMBER OF INTERRUPTIONS | 5.6 | 3.7 | 3.8 | 4.0 |

| 8 THE SAIFI FOR THE TOTAL NUMBER OF INTERRUPTIONS WITHIN EACH CLASS | | | | |
| Class A | 0.1 | 0.0 | 0.1 | 0.2 |
| Class B | 0.5 | 0.4 | 0.4 | 0.5 |
| Class C | 3.9 | 2.5 | 3.1 | 3.1 |
| Class D | 1.0 | 0.8 | 0.2 | 0.2 |
| Class E | 0 | 0 | 0 | 0 |
| Class F | 0 | 0 | 0 | 0 |
| Class G | 0 | 0 | 0 | 0 |

| 9 THE CAIDI FOR THE TOTAL OF ALL INTERRUPTIONS | 59 | 85 | 98 | 410 |

| 10 THE CAIDI FOR THE TOTAL OF ALL INTERRUPTIONS WITHIN EACH CLASS | | | | |
| Class A | 240 | 0 | 186 | 230 |
| Class B | 157 | 203 | 227 | 118 |
| Class C | 52 | 89 | 71 | 53 |
| Class D | 11 | 14 | 196 | 110 |
| Class E | 0 | 0 | 0 | 0 |
| Class F | 0 | 0 | 0 | 0 |
| Class G | 0 | 0 | 0 | 0 |

Note: As per Regulation 16(2)(b) Reliability Performance Measures for 1998 have been calculated excluding low voltage circuits and 11kV fuses supplying less than three customers.

PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP LEGISLATION SERVICES. WELLINGTON, NEW ZEALAND—1998

DEPARTMENT OF INTERNAL AFFAIRS
TE TARI TAIWHENUA

ISSN 0111-5650
Price $3.95 (inc. G.S.T.)
31507—98A


PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 123


NZLII PDF NZ Gazette 1998, No 123





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Efficiency, Electricity Statistics, Load Factor, Loss Ratio, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Reliability, Interruptions, Faults, SAIDI, SAIFI, CAIDI