✨ Reliability Performance Measures




NEW ZEALAND GAZETTE

No. 122

ALPINE ENERGY LIMITED

RELIABILITY PERFORMANCE MEASURES

FOR THE YEAR ENDED 31 MARCH 1998 (Continued)

1998 1997 1996 1995
7. The SAIFI for total of interruptions 2.67 2.62 2.66 1.43
  1. The SAIFI for total of interruptions within each interruption class -
Class 1998 1997 1996 1995
Class A 0.08 0.11 0.11 0.19
Class B 0.25 0.04 0.04 0.14
Class C 0.76 0.71 0.72 1.1
Class D 1.58 1.77 1.79 0.03
Class E 0 0 0 0
Class F 0 0 0 0
Class G 0 0 0 0
  1. The CAIDI for total of interruptions |
1998 1997 1996 1995
56 33 69 98
  1. The CAIDI for total of interruptions within each interruption class -
Class 1998 1997 1996 1995
Class A 229 258 334 280
Class B 95 650 383 129
Class C 53 32 81 60
Class D 43 6 41 40
Class E 0 0 0 0
Class F 0 0 0 0
Class G 0 0 0 0


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 122


NZLII PDF NZ Gazette 1998, No 122





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Reliability, Interruptions, Faults, SAIDI, Electricity, Alpine Energy Limited