β¨ Electricity Reliability Performance Measures
NEW ZEALAND GAZETTE
No. 116
Year ended 31 March
| 1998 | 1997 | 1996 | 1995 |
|---|
Regulation 16:
(1) Reliability performance measures
Class A | 0 | 0 | 0 | 0
Class B | 343 | 511 | 350 | 290
Class C | 257 | 385 | 369 | 300
Class D | 4 | 10 | 12 | 4
Class E | 0 | 0 | 0 | 0
Class F | 0 | 0 | 0 | 0
Class G | 0 | 0 | 0 | 0
Total | 604 | 906 | 731 | 594
(2) Total number of faults per 100 circuit kilometres prescribed voltage electric lines.
| 10.0 | 14.7 | 14.4 | 12.1
(3) Total number of faults per 100 circuit kilometres of underground prescribed voltage electric lines.
- 33kV | 0 | 0 | 0 | 0
- 11kV | 0 | 16.7 | 4.8 | 33.3
- Total | 0 | 16.7 | 4.8 | 33.3
(4) Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric lines.
- 33kV | 15.7 | 13.2 | 16.7 | 9.8
- 11kV | 9.5 | 14.7 | 15.0 | 12.3
- Total | 10.0 | 14.7 | 14.5 | 12.1
(5) The SAIDI for total of interruptions
| 662.2| 866.3| 714.92| 886.4
(6) The SAIDI for total of interruptions within each interruptions class -
Class A | 0 | 0 | 0 | 0
Class B | 334.5| 368.7| 331.05| 398.7
Class C | 303.8| 460.5| 370.15| 468.8
Class D | 23.9 | 37.09| 13.71 | 18.8
Class E | 0 | 0 | 0 | 0
Class F | 0 | 0 | 0 | 0
Class G | 0 | 0 | 0 | 0
(7) The SAIFI for total of interruptions
| 9.3 | 11.00| 11.03| 9.59
(8) The SAIFI for total of interruptions within each interruption class -
Class A | 0 | 0 | 0 | 0
Class B | 1.79 | 1.90 | 1.68 | 1.52
Class C | 6.98 | 7.76 | 9.08 | 7.59
Class D | 0.54 | 1.34 | 0.27 | 0.47
Class E | 0 | 0 | 0 | 0
Class F | 0 | 0 | 0 | 0
Class G | 0 | 0 | 0 | 0
(9) The CAIDI for total of interruptions
| 71.18| 78.78| 64.81| 92.43
(10) The CAIDI for total interruptions within each interruption class -
Class A | - | - | - | -
Class B | 186.73| 194.30| 196.73| 262.33
Class C | 43.55| 59.35| 40.76| 61.77
Class D | 44.54| 27.68| 51.37| 40.04
Class E | - | - | - | -
Class F | - | - | - | -
Class G | - | - | - | -
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 116
NZLII —
NZ Gazette 1998, No 116
β¨ LLM interpretation of page content
π
Waitomo Energy Services Limited Financial Performance Statement
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability Performance, Faults, Interruptions, SAIDI, SAIFI, CAIDI, Circuit Kilometres