Energy Supply Statistics




2836 NEW ZEALAND GAZETTE No. 115

1998 1997 1996 1995

7,8 SAIFI

Class Description 1998 1997 1996 1995
A Planned outages TransPower - - - -
B Planned outages WEL 0.06 0.04 0.10 0.24
C Unplanned outages WEL 2.12 3.15 2.40 2.53
D Unplanned outages TransPower 0.14 - 0.50 -
E Unplanned Interruption ECNZ - - - -
F Unplanned Interruption other generator - - - -
G Other Interruption - - - -

TOTAL | 2.32 | 3.19 | 3.00 | 2.77 |

9,10 CAIDI

Class Description 1998 1997 1996 1995
A Planned outages TransPower - - - -
B Planned outages WEL 79.58 84.93 182.00 159.92
C Unplanned outages WEL 67.73 54.83 58.00 49.44
D Unplanned outages TransPower 301.34 - 77.00 -
E Unplanned Interruption ECNZ - - - -
F Unplanned Interruption other generator - - - -
G Other Interruption - - - -

TOTAL | 82.56 | 55.16 | 66.00 | 59.00 |

PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP LEGISLATION SERVICES. WELLINGTON, NEW ZEALAND—1998
ISSN 0111-5650
Price $3.95 (inc. G.S.T.)
31488—98A


PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 115


NZLII PDF NZ Gazette 1998, No 115





✨ LLM interpretation of page content

🏗️ Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏗️ Infrastructure & Public Works
Energy, Load factor, Loss ratio, Capacity utilisation, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers, Interruptions, Faults, SAIDI, SAIFI, CAIDI, TransPower, WEL, ECNZ