✨ Energy Supply Statistics
2836 NEW ZEALAND GAZETTE No. 115
1998 1997 1996 1995
7,8 SAIFI
| Class | Description | 1998 | 1997 | 1996 | 1995 |
|---|---|---|---|---|---|
| A | Planned outages TransPower | - | - | - | - |
| B | Planned outages WEL | 0.06 | 0.04 | 0.10 | 0.24 |
| C | Unplanned outages WEL | 2.12 | 3.15 | 2.40 | 2.53 |
| D | Unplanned outages TransPower | 0.14 | - | 0.50 | - |
| E | Unplanned Interruption ECNZ | - | - | - | - |
| F | Unplanned Interruption other generator | - | - | - | - |
| G | Other Interruption | - | - | - | - |
TOTAL | 2.32 | 3.19 | 3.00 | 2.77 |
9,10 CAIDI
| Class | Description | 1998 | 1997 | 1996 | 1995 |
|---|---|---|---|---|---|
| A | Planned outages TransPower | - | - | - | - |
| B | Planned outages WEL | 79.58 | 84.93 | 182.00 | 159.92 |
| C | Unplanned outages WEL | 67.73 | 54.83 | 58.00 | 49.44 |
| D | Unplanned outages TransPower | 301.34 | - | 77.00 | - |
| E | Unplanned Interruption ECNZ | - | - | - | - |
| F | Unplanned Interruption other generator | - | - | - | - |
| G | Other Interruption | - | - | - | - |
TOTAL | 82.56 | 55.16 | 66.00 | 59.00 |
PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP LEGISLATION SERVICES. WELLINGTON, NEW ZEALAND—1998
ISSN 0111-5650
Price $3.95 (inc. G.S.T.)
31488—98A
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 115
NZLII —
NZ Gazette 1998, No 115
✨ LLM interpretation of page content
🏗️
Energy Delivery Efficiency Performance Measures and Statistics
(continued from previous page)
🏗️ Infrastructure & Public WorksEnergy, Load factor, Loss ratio, Capacity utilisation, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers, Interruptions, Faults, SAIDI, SAIFI, CAIDI, TransPower, WEL, ECNZ