✨ Electricity Performance Measures




20 AUGUST

NEW ZEALAND GAZETTE

2293

TASMAN ENERGY

STATEMENT OF PERFORMANCE MEASURES

THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

FOR THE YEAR ENDING 31 MARCH 1997

CLASSIFICATION OF INTERRUPTIONS
1997 SAIFI Int/Con-Cust 1996 SAIFI Int/Con-Cust 1995 SAIFI Int/Con-Cust
Class A TransPower Planned 0 0.204 0.05
Class B Line Owner Planned 0.64 0.667 0.14
Class C Line Owner Unplanned 2.03 1.369 1.3
Class D TransPower Unplanned 0.03 0.841 1.71
Class E Unplanned ECNZ 0 0 0
Class F Unplanned Other Generator 0 0 0
Class G Other 0 0 0
TOTAL 2.7 3.081 3.2
CLASSIFICATION OF INTERRUPTIONS
1997 CAIDI Min/Cust-Int 1996 CAIDI Min/Cust-Int 1995 CAIDI Min/Cust-Int
Class A TransPower Planned 0 318.74 180
Class B Line Owner Planned 122.27 151.38 174
Class C Line Owner Unplanned 74.94 93.07 95
Class D TransPower Unplanned 36.67 30.69 36
Class E Unplanned ECNZ 0 0 0
Class F Unplanned Other Generator 0 0 0
Class G Other 0 0 0
TOTAL 85.73 103.66 68

6. VALUATION OF ASSETS TO BE DISCLOSED BY LINE OWNERS

ODV of Line Owner Assets 31 March 1997

$107,906,000



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 98


NZLII PDF NZ Gazette 1997, No 98





✨ LLM interpretation of page content

🏭 Tasman Energy Line Business Statement of Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Interruptions, Faults, Valuation, Assets