β¨ Electricity Performance Measures
20 AUGUST
NEW ZEALAND GAZETTE
2293
TASMAN ENERGY
STATEMENT OF PERFORMANCE MEASURES
THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
FOR THE YEAR ENDING 31 MARCH 1997
CLASSIFICATION OF INTERRUPTIONS
| 1997 SAIFI Int/Con-Cust | 1996 SAIFI Int/Con-Cust | 1995 SAIFI Int/Con-Cust | |
|---|---|---|---|
| Class A TransPower Planned | 0 | 0.204 | 0.05 |
| Class B Line Owner Planned | 0.64 | 0.667 | 0.14 |
| Class C Line Owner Unplanned | 2.03 | 1.369 | 1.3 |
| Class D TransPower Unplanned | 0.03 | 0.841 | 1.71 |
| Class E Unplanned ECNZ | 0 | 0 | 0 |
| Class F Unplanned Other Generator | 0 | 0 | 0 |
| Class G Other | 0 | 0 | 0 |
| TOTAL | 2.7 | 3.081 | 3.2 |
CLASSIFICATION OF INTERRUPTIONS
| 1997 CAIDI Min/Cust-Int | 1996 CAIDI Min/Cust-Int | 1995 CAIDI Min/Cust-Int | |
|---|---|---|---|
| Class A TransPower Planned | 0 | 318.74 | 180 |
| Class B Line Owner Planned | 122.27 | 151.38 | 174 |
| Class C Line Owner Unplanned | 74.94 | 93.07 | 95 |
| Class D TransPower Unplanned | 36.67 | 30.69 | 36 |
| Class E Unplanned ECNZ | 0 | 0 | 0 |
| Class F Unplanned Other Generator | 0 | 0 | 0 |
| Class G Other | 0 | 0 | 0 |
| TOTAL | 85.73 | 103.66 | 68 |
6. VALUATION OF ASSETS TO BE DISCLOSED BY LINE OWNERS
ODV of Line Owner Assets 31 March 1997
$107,906,000
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 98
NZLII —
NZ Gazette 1997, No 98
β¨ LLM interpretation of page content
π
Tasman Energy Line Business Statement of Performance Measures
(continued from previous page)
π Trade, Customs & IndustryElectricity, Performance Measures, Interruptions, Faults, Valuation, Assets