✨ Electricity Reliability Statistics




18 AUGUST

NEW ZEALAND GAZETTE

2157

  1. The SAIDI for total of interruptions
1997 1996 1995
86 182 140
  1. The SAIDI for total of interruptions within each interruption class -
Class 1997 1996 1995
A 28 37 54
B 24 14 19
C 23 58 66
D 11 73 1
E 0 0 0
F 0 0 0
G 0 0 0
  1. The SAIFI for total of interruptions
1997 1996 1995
2.62 2.66 1.43
  1. The SAIFI for total of interruptions within each interruption class -
Class 1997 1996 1995
A 0.11 0.11 0.19
B 0.04 0.04 0.14
C 0.71 0.72 1.1
D 1.77 1.79 0.03
E 0 0 0
F 0 0 0
G 0 0 0
  1. The CAIDI for total of interruptions
1997 1996 1995
33 69 98
  1. The CAIDI for total of interruptions within each interruption class -
Class 1997 1996 1995
A 258 334 280
B 650 383 129
C 32 81 60
D 6 41 40
E 0 0 0
F 0 0 0
G 0 0 0


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 90


NZLII PDF NZ Gazette 1997, No 90





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Reliability Performance, Statistics, Electricity, Alpine Energy Limited, Interruptions, Faults, Circuit Kilometres, Voltage Levels