β¨ Electricity Reliability Statistics
18 AUGUST
NEW ZEALAND GAZETTE
2157
- The SAIDI for total of interruptions
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| 86 | 182 | 140 |
- The SAIDI for total of interruptions within each interruption class -
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| A | 28 | 37 | 54 |
| B | 24 | 14 | 19 |
| C | 23 | 58 | 66 |
| D | 11 | 73 | 1 |
| E | 0 | 0 | 0 |
| F | 0 | 0 | 0 |
| G | 0 | 0 | 0 |
- The SAIFI for total of interruptions
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| 2.62 | 2.66 | 1.43 |
- The SAIFI for total of interruptions within each interruption class -
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| A | 0.11 | 0.11 | 0.19 |
| B | 0.04 | 0.04 | 0.14 |
| C | 0.71 | 0.72 | 1.1 |
| D | 1.77 | 1.79 | 0.03 |
| E | 0 | 0 | 0 |
| F | 0 | 0 | 0 |
| G | 0 | 0 | 0 |
- The CAIDI for total of interruptions
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| 33 | 69 | 98 |
- The CAIDI for total of interruptions within each interruption class -
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| A | 258 | 334 | 280 |
| B | 650 | 383 | 129 |
| C | 32 | 81 | 60 |
| D | 6 | 41 | 40 |
| E | 0 | 0 | 0 |
| F | 0 | 0 | 0 |
| G | 0 | 0 | 0 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 90
NZLII —
NZ Gazette 1997, No 90
β¨ LLM interpretation of page content
π
Alpine Energy Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Statistics, Electricity, Alpine Energy Limited, Interruptions, Faults, Circuit Kilometres, Voltage Levels