ALPINE ENERGY LIMITED

ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

FOR THE YEAR ENDED 31 MARCH 1997

Pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994;

  1. Energy Delivery Efficiency Performance Measures and Statistics
1997 1996 1995
a) Load Factor 64.0% 63.05% 65.26%
b) Loss Ratio 5.6% 5.01% 5.13%
c) Capacity Utilisation 33.0% 32.82% 31.35%
  1. Statistics
1997 1996 1995
(a) System Lengths (kms)
22/33kV 179 161 304
11kV 2,843 2,824 2,585
230/400V 554 551 551
Total 3,576 3,536 3,440

| (b) Circuit Length (overhead) (kms) |
| 22/33kV | 176 | 158 | 301 |
| 11kV | 2,686 | 2,669 | 2,433 |
| 230/400V | 345 | 345 | 346 |
| Total | 3,207 | 3,172 | 3,080 |

| (c) Circuit Length (underground) (kms) |
| 22/33kV | 3 | 3 | 3 |
| 11kV | 157 | 155 | 152 |
| 230/400V | 209 | 206 | 205 |
| Total | 369 | 364 | 360 |

| (d) Transformer Capacity (kVA) |
| | 250,435| 246,795| 250,000|

| (e) Maximum Demand (kW) |
| | 83,000 | 81,000 | 78,370 |

| (f) Total Electricity Supplied (GWh) |
| | 441.5 | 425 | 425 |

| (g) Total Electricity Conveyed for Unrelated Parties (GWh) |
| | 37.4 | 103 | 100 |

| (h) Total Customer |
| | 27,283 | 26,945 | 27,100 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 90


NZLII PDF NZ Gazette 1997, No 90





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Efficiency, Performance Measures, Statistics, Electricity, Alpine Energy Limited, Load Factor, Loss Ratio, Capacity Utilisation, System Lengths, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Electricity Conveyed, Customers