nominal line voltages:-
| 11 kV overhead | 13.69 |
| 22 kV overhead | 18.18 |
| 33 kV overhead | 9.83 |
| Total | 13.34 |
-
The SAIDI for the total of interruptions ... 468.58 minutes
-
The SAIDI for the total number of interruptions within each interruption class:-
(b) Planned interruptions by Counties Power ... 171.46 minutes
(c) Unplanned interruptions originating within Counties Power system ... 295.03 minutes
(c) Unplanned interruptions originating with Transpower system ... 2.09 minutes
-
The SAIFI for the total number of interruptions ... 5.60 interruptions
The SAIFI for the total number of interruptions within each interruption class:-
(b) Planned interruptions by Counties Power ... 0.86 interruptions
(c) Unplanned interruptions originating within Counties Power system ... 4.69 interruptions
(d) Unplanned interruptions originating with Transpower system ... 0.05 interruptions
-
The CAIDI for the total of all interruptions ... 83.72 minutes
-
The CAIDI for the total number of interruptions within each interruption class:-
(b) Planned interruptions by Counties Power ... 199.16 minutes
(c) Unplanned interruptions originating within Counties Power system ... 62.9 minutes
(d) Unplanned interruptions originating with Transpower system ... 45.56 minutes
Number of customers has been calculated as the average of opening and closing figures for the year.
PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP LEGISLATION SERVICES. WELLINGTON, NEW ZEALAND—1997
ISSN 0111-5650
Price $2.30 (inc. G.S.T.)
86169—97A
Next Page →
✨ LLM interpretation of page content
🌾
Disclosure of Reliability Performance Measures for Counties Power Limited
(continued from previous page)
🌾 Primary Industries & ResourcesElectricity, Reliability, Performance Measures, Interruptions, Faults, Counties Power Limited
NZ Gazette 1997, No 80