✨ Energy Efficiency Statistics




NEW ZEALAND GAZETTE

No. 176

Disclosure of energy delivery efficiency performance measures and statistics pursuant to Regulation 15 and Part II of the First Schedule of the Electricity (Information Disclosure) Regulations 1994.

Energy Delivery Efficiency Measures

1996/97 1995/96 1994/95
Load Factor 58.1% 57.5% 56.8%
Loss Ratio 5.0% 5.0% 5.5%
Capacity Utilisation 38.27% 39.1% 40.7%

Statistics

System Information (kilometres)

33kV

1996/97 1995/96 1994/95
System length breakdown 22.5 22.5 22.5
Underground circuit length 12.6 12.6 12.6
Overhead circuit length 9.9 9.9 9.9

11kV

1996/97 1995/96 1994/95
System length breakdown 79.1 79.0 78.5
Underground circuit length 67.9 67.8 67.3
Overhead circuit length 11.2 11.2 11.2

400V

1996/97 1995/96 1994/95
System length breakdown 115.2 114.3 112.0
Underground circuit length 88.0 86.9 84.6
Overhead circuit length 27.2 27.4 27.4

Total

1996/97 1995/96 1994/95
System length breakdown 216.8 215.8 213.0
Underground circuit length 168.5 167.3 161.8
Overhead circuit length 48.3 48.5 51.2

| Transformer capacity (kVA)| 72,520 | 71,820 | 66,815 |
| Maximum demand (kilowatts)| 28,095 | 28,100 | 27,200 |
| Total electricity supplied (kWh) | 143,529,169 | 141,566,178 | 135,441,303 |
| Total conveyed-non-associated parties | 0 | 0 | 0 |
| Total customers | 8,359 | 8,322 | 8,242 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 176


NZLII PDF NZ Gazette 1997, No 176





✨ LLM interpretation of page content

🏭 Disclosure of energy delivery efficiency performance measures and statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Customers, Nelson Electricity Limited