NEW ZEALAND GAZETTE

No. 174

Regulation 18:

Schedule 1 Part 4: Reliability Performance Measures.

  1. Unplanned interruptions in distribution system:

(a) The following information is contained in the table below:

  • Unplanned Interruption Measure: The measure of unplanned interruptions (other than those directly resulting from unplanned interruptions of a transmission system), calculated by the formula: a/b where a is the sum obtained by adding together the number of customer-hours lost during each interruption; and b is the total number of customers being supplied by means of the system.

(b) In respect of the conveyance of gas through a distribution system, there were no unplanned interruptions directly resulting from unplanned interruptions of a transmission system.

Enerco Limited



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 174


NZLII PDF NZ Gazette 1997, No 174





✨ LLM interpretation of page content

🏭 Certification of Financial Statements and Performance Measures by Enerco New Zealand Limited (continued from previous page)

🏭 Trade, Customs & Industry
Gas, Energy Delivery, Efficiency Performance Measures, Statistics, Load Factor, Unaccounted-for Gas, System Length, Maximum Monthly Amount, Total Gas Conveyed, Customers, Unplanned Interruptions, Distribution System, Reliability Performance Measures