β¨ Electricity Company Disclosures
22 OCTOBER
NEW ZEALAND GAZETTE
3557
COUNTIES POWER LIMITED
ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
The material below is published to rectify errors and omissions in material published previously:
-
For Regulations 13, 15 & 16 information for the year ending 31 March 1995 is now included.
-
For Regulation 15 the following corrections are made for the year ending 31 March 1997:
| AS DISCLOSED PREVIOUSLY | CORRECT |
|---|---|
| Load Factor 56.3% | 57.2% |
| Circuit length of underground cables 11kV 0 km | 61 km |
| 22 kV 61 km | 1 km |
| 33 kV 1km | 0 km |
James M. Naughton
Chief Executive Officer
26 August 1997
COUNTIES POWER LIMITED
DISCLOSURE OF FINANCIAL PERFORMANCE MEASURES AND EFFICIENCY PERFORMANCE MEASURES PURSUANT TO REGULATION 13 AND PART II OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
CERTIFICATION OF PERFORMANCE MEASURES BY AUDITORS
We have examined the information appearing, being -
a) Financial performance measures specified in clause 1 of Part II of the First Schedule to the Electricity (Information Disclosure) Regulations 1994; and
b) Financial components of the efficiency performance measures specified in clause 2 of Part II of that Schedule, -
and having been prepared by Counties Power Limited for the year ended 31 March 1997 for the purposes of regulation 13 of those regulations.
We certify that, having made all reasonable enquiry, to the best of my knowledge, that information has been prepared in accordance with the Electricity (Information Disclosure) Regulations 1994.
D.P. Scott
COOPERS & LYBRAND Chartered Accountants
On behalf of the Controller and Auditor-General
25 June 1997
YEAR TO 31 MARCH:
- Financial Performance Measures
(a) Accounting return on total assets, being earnings before interest and tax, divided by average total funds employed
| 1997 | 1996 | 1995 |
|---|---|---|
| 2.2% | 3.1% | 3.0% |
(b) Accounting return on equity, being net profit after tax, divided by average total shareholdersβ funds
| 1997 | 1996 | 1995 |
|---|---|---|
| 1.8% | 2.1% | 2.1% |
(c) Accounting rate of profit
| 1997 | 1996 | 1995 |
|---|---|---|
| 1.2% | 2.3% | 1.5% |
- Efficiency Performance Measures
(a) Direct line cost per kilometre
| 1997 | 1996 | 1995 |
|---|---|---|
| $1,176 | $1,091 | $1,067 |
(b) Indirect line cost per electricity customer
| 1997 | 1996 | 1995 |
|---|---|---|
| $79 | $96 | $87 |
(Includes line business allocation of billing and customer liaison costs)
COUNTIES POWER LIMITED
DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
YEAR TO 31 MARCH:
Energy delivery efficiency performance measures
| 1997 | 1996 | 1995 |
|---|---|---|
| (a) Load factor 57.2% | 57.1% | 57.6% |
| (b) Loss ratio 7.8% | 8.2% | 8.4% |
| (c) Capacity utilisation 35% | 37.8% | 35.5% |
Statistics
(a) System length, broken down by voltage
| 33 kV | 174 km | 173 km | 173 km |
|---|---|---|---|
| 22 kV | 138 km | 22 km | 22 km |
| 11 kV | 1410 km | 1477 km | 1445 km |
| 400 V | 1273 km | 1262 km | 1257 km |
| Total | 2995 km | 2934 km | 2897 km |
(b) Circuit length of overhead lines, broken down by voltage
| 33 kV | 173 km | 173 km | 173 km |
|---|---|---|---|
| 22 kV | 77 km | 22 km | 22 km |
| 11 kV | 1410 km | 1454 km | 1423 km |
| 400 V | 1110 km | 1104 km | 1104 km |
| Total | 2770 km | 2753 km | 2722 km |
(c) Circuit length of underground cables, broken down by voltage
| 11 kV | 61 km | 23 km | 22 km |
|---|---|---|---|
| 22 kV | 1 km | Nil | Nil |
| 400 V | 163 km | 158 km | 153 km |
| Total | 225 km | 181 km | 175 km |
| 1997 | 1996 | 1995 |
|---|---|---|
| (d) Transformer capacity 229,808 kVA | 197,000 kVA | 197,246 kVA |
| (e) Maximum demand 75,335 kW | 79,493 kW | 70,055 kW |
| (f) Total electricity supplied from the system 377,336,000 kWh | 373,099,000 kWh | 324,626,697 kWh |
| (g) Total electricity conveyed through the system 1,831,400 kWh | 1,477,600 kWh | NIL |
| (h) Total customers (average for period) 29977 | 29860 | 29049 |
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
YEAR TO 31 MARCH:
- Total number of interruptions
| 1997 | 1996 | 1995 |
|---|---|---|
| (a) Planned interruptions by Transpower Nil | Nil | Nil |
| (b) Planned interruptions by Counties Power 207 | 305 | 312 |
| (c) Unplanned interruptions originating within Counties Power system 258 | 221 | 198 |
| (d) Unplanned interruptions originating with TransPower system Nil | 1 | 1 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 152
NZLII —
NZ Gazette 1997, No 152
β¨ LLM interpretation of page content
π Corrections to Electricity Information Disclosure
π Trade, Customs & Industry26 August 1997
Electricity, Corrections, Disclosure, Load Factor, Circuit Length
- James M. Naughton, Chief Executive Officer
π Certification of Financial Performance Measures
π Trade, Customs & Industry25 June 1997
Financial Performance, Efficiency, Auditors, Certification
- D.P. Scott, COOPERS & LYBRAND Chartered Accountants, On behalf of the Controller and Auditor-General
π Financial Performance Measures
π Trade, Customs & IndustryFinancial Performance, Return on Assets, Return on Equity, Profit Rate
π Efficiency Performance Measures
π Trade, Customs & IndustryEfficiency, Direct Line Cost, Indirect Line Cost
π Energy Efficiency Performance Measures
π Trade, Customs & IndustryEnergy Efficiency, Load Factor, Loss Ratio, Capacity Utilisation
π Reliability Performance Measures
π Trade, Customs & IndustryReliability, Interruptions, Planned, Unplanned