✨ Electrical Reliability Performance Measures




3184

NEW ZEALAND GAZETTE

No. 136

Year ended 31 March
1997 1996 1995

Regulation 16
5. (1) Reliability performance measures
Class A 0 0 0
Class B 0 0 1
Class C 11 11 10
Class D 1 0 2
Class E 0 0 0
Class F 0 0 0
Class G 0 0 0

  Total         12      11      13

(2) Total number of faults per 100 circuit
kilometres of prescribed voltage electric
lines

                                6.2     6.2     5.6

(3) Total number of faults per 100 circuit
kilometres of underground prescribed
voltage electric lines

  - 33kV         0       0       0
  - 11kV         5.0     5.0     2.5
  - Total        4.0     4.4     2.2

(4) Total number of faults per 100 circuit
kilometres of overhead prescribed
voltage electric lines

  - 33kV        11.1    12.8     3.2
  - 11kV        33.3    13.4    63.2
  - Total       18.5    12.9    17.1

(5) The SAIDI for total of interruptions

                                23.4    15.4    31.5

(6) The SAIDI for total of interruptions within
each interruption class -

  Class A        0       0       0
  Class B        0       0       0.4
  Class C       15.6    15.4    18.1
  Class D        7.8     0      13.0
  Class E        0       0       0
  Class F        0       0       0
  Class G        0       0       0


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 135


NZLII PDF NZ Gazette 1997, No 135





✨ LLM interpretation of page content

🌾 Electro Power Limited Financial and Efficiency Performance Measures (continued from previous page)

🌾 Primary Industries & Resources
Electricity, Financial Performance, Efficiency Performance, Electro Power Limited, Electricity (Information Disclosure) Regulations 1994, Reliability Performance Measures, Faults, Interruptions