NEW ZEALAND GAZETTE

15 SEPTEMBER

3025

TRANSALTA NEW ZEALAND LIMITED

PERFORMANCE MEASURES AND STATISTICS (Continued)

For The Year Ended 31 March 1997


Regulation 15

4 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

Load Factor 54.18% 49.86% 51.48%
Loss Ratio 5.04% 4.76% 4.52%
Capacity Utilisation 41.87% 44.05% 41.57%

5 LINE LENGTHS

See table below for the following statistics:

  • System Length (kms) and breakdown by nominal voltage.
  • Underground circuit length (kms) and breakdown by nominal line voltage.
  • Overhead circuit length (kms) and breakdown by nominal voltage.
Kilometres Overhead Circuit Underground Circuit Total System
Mar-97 Mar-96 Mar-95 Mar-97 Mar-96 Mar-95 Mar-97 Mar-96 Mar-95
33kV 57 58 65 168 161 158 225 219 223
11kV 662 681 691 921 883 871 1,583 1,564 1,562
3.3kV - - - - - - - - -
400V 924 953 969 1,165 1,143 1,120 2,089 2,096 2,089
TOTAL 1,643 1,692 1,725 2,254 2,187 2,149 3,897 3,879 3,874
31-Mar-97 31-Mar-96 31-Mar-95
Transformer Capacity (kVA) 1,152,162 1,137,663 1,132,315
Maximum Demand (kW) 482,400 501,200 470,740
Total Electricity supplied by system (kWh) 2,174,001,382 2,084,727,706 2,026,976,203
Total Electricity conveyed by system for other persons (kWh) 33,814,617 74,714,191 58,315,342
Total Customers (average for year) 142,358 141,042 141,595

Regulation 16

6 TOTAL NUMBER OF INTERRUPTIONS AND BREAKDOWNS BY INTERRUPTION CLASS

Type of interruption Class No. No. No.
31-Mar-97 31-Mar-96 31-Mar-95
Planned - Trans Power A - - -
Planned - TransAlta B 78 138 123
Unplanned - TransAlta C 278 282 323
Unplanned - Trans Power D 4 8 10
Unplanned - ECNZ E - - -
Unplanned - Other F - - -
Any other interruption G - - -
TOTAL: All Interruptions 360 428 456


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 128


NZLII PDF NZ Gazette 1997, No 128





✨ LLM interpretation of page content

🌾 Financial Statements of TransAlta New Zealand Limited (continued from previous page)

🌾 Primary Industries & Resources
Electricity, Financial Performance, Accounting Return, Total Assets, Equity, Profit, Efficiency, Direct Line Cost, Indirect Line Costs, Optimised Deprival Valuation, Electricity Customer, System Length, Expenditure