✨ Electricity Reliability Performance Measures




NEW ZEALAND GAZETTE

No. 127

DUNEDIN ELECTRICITY LTD

RELIABILITY PERFORMANCE MEASURES

PURSUANT TO REGULATION 16 ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

Reliability Statistics for the Year Ended 31 March 1997

Connected Customers Line 33kV Line 11kV Line 6.6kV Cable 33kV Cable 11kV Cable 6.6kV Total Density Cust/km
At start of period 49,837 149.9 236.5 488.1 75.2 20.4 229.5 1,200 41.5
At end of period 49,891 149.9 236.6 488.9 75.2 20.7 230.6 1,202 41.5
Average 49,864 149.9 236.5 488.5 75.2 20.5 230.0 1,201 41.5
Average line/cable 875.0 325.8
Disclosure Regulations SAIDI (Cust Mins) SAIDI (Mins/Cust) SAIFI (Cust Int) SAIFI (Int/Cust) CAIDI (Mins/Int) No of Interruptions Class
Distributor Planned 103,921 2.08 2,399 0.05 43.30 14 B
Distributor Unplanned 2,802,324 56.20 47,642 0.96 58.80 115 C
Subtotal 2,906,245 58.28 50,041 1.00 58.10 129
Trans Power Planned - - - - - - A
Trans Power Unplanned - - - - - - D
Subtotal
ECNZ Planned - - - - - - G
ECNZ Unplanned - - - - - - E
Subtotal
Other Gen Planned - - - - - -
Other Gen Unplanned - - - - - - F
Other Than Above
Subtotal
TOTAL 2,906,245 58.28 50,041 1.00 58.10 129
Unplanned Faults by Voltage Lines Faults OH Length km OH per 100 km Cables Faults UG Length km UG per 100 km
33kV 4 149.9 2.7 3 75.2 4.0
11kV 43 236.5 18.2 1 20.5 4.9
6.6kV 48 488.5 9.8 12 230.0 5.2
TOTAL 95 875.0 10.9 16 325.8 4.9
Total Faults Total Length in km No Faults per 100 km
Total Lines and Cables 111 1,201 9.2


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 127


NZLII PDF NZ Gazette 1997, No 127





✨ LLM interpretation of page content

πŸ’° Reliability Performance Measures for Dunedin Electricity Ltd (continued from previous page)

πŸ’° Finance & Revenue
Reliability Statistics, Electricity, Performance Measures, Dunedin Electricity Ltd