β¨ Electricity Reliability Statistics
8 SEPTEMBER
NEW ZEALAND GAZETTE
2807
Regulation 16
5. Reliability Performance Measures
(1) Interruptions
| Year Ended 31 March | |
|---|---|
| 1997 | |
| Class | |
| Class A | 0 |
| Class B | 661 |
| Class C | 1,515 |
| Class D | 6 |
| Class E | 0 |
| Class F | 0 |
| Class G | 0 |
| Total | 2,182 |
Total number of faults per 100 circuit kilometres of prescribed voltage electric lines
(2) Total System:
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| - 110kV | 4.00 | 0 | 0 |
| - 66kV | 0.81 | 3.11 | 4.40 |
| - 33kV | 6.15 | 5.38 | 9.00 |
| - 11kV | 22.28 | 22.20 | 24.40 |
| Total | 19.76 | 20.14 | 22.60 |
(3) Underground Circuit:
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| - 33kV | 2.26 | 4.18 | 2.90 |
| - 11kV | 6.17 | 5.29 | 8.40 |
| Total | 5.86 | 5.21 | 8.00 |
(4) Overhead Line:
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| - 110kV | 4.00 | 0 | 0 |
| - 66kV | 0.81 | 3.64 | 4.40 |
| - 33kV | 8.55 | 5.58 | 9.70 |
| - 11kV | 25.15 | 25.10 | 27.30 |
| Total | 22.10 | 22.70 | 25.00 |
(5) The SAIDI for total of interruptions (minutes):
| 1997 | 1996 | 1995 |
|---|---|---|
| 219.40 | 233.00 | 309.00 |
(6) The SAIDI for total interruptions within each interruption class (minutes):
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| Class A | 0 | 63.40 | 62.00 |
| Class B | 23.01 | 28.50 | 44.00 |
| Class C | 164.93 | 129.10 | 154.00 |
| Class D | 31.54 | 12.00 | 49.00 |
| Class E | 0 | 0 | 0 |
| Class F | 0 | 0 | 0 |
| Class G | 0 | 0 | 0 |
(7) The SAIFI for total of interruptions
| 1997 | 1996 | 1995 |
|---|---|---|
| 4.58 | 3.36 | 5.06 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 118
NZLII —
NZ Gazette 1997, No 118
β¨ LLM interpretation of page content
ποΈ
Performance Measures and Statistics for the year ending 31 March 1997
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Performance Measures, Statistics, Reliability, Interruptions, SAIDI, SAIFI, Voltage Lines