β¨ Electricity Reliability Statistics
Mercury Energy Limited and Subsidiaries
Performance Measures and Statistics for the year ended 31 March 1997 continued
For the Purposes of The Electricity (Information Disclosure) Regulations 1994
FIRST SCHEDULE - PART IV continued
Reliability performance measures continued
SAIDI (System Average Interruption Duration Index)
-
The SAIDI for the total interruptions
1997 1996 1995
123.77 120.77 125.83 -
The SAIDI for the total interruptions within each interruption class:
Class A Planned Trans Power interruption
Class B Planned interruption by a Line Operator (other than Trans Power) 12.34 21.07 39.73
Class C Unplanned interruption originating within the principal Line Owners works 95.34 94.71 82.48
Class D Unplanned Trans Power interruption 16.10 5.00 3.63
Class E Unplanned ECNZ interruption
Class F Unplanned interruption originating from a generator other than ECNZ
Class G Other
SAIFI (System Average Interruption Frequency Index)
-
The SAIFI for the total interruptions
2.19 1.95 1.78 -
The SAIFI for the total interruptions within each interruption class:
Class A Planned Trans Power interruption
Class B Planned interruption by a Line Operator (other than Trans Power) 0.22 0.16 0.33
Class C Unplanned interruption originating within the principal Line Owners works 1.62 1.75 1.31
Class D Unplanned Trans Power interruption 0.36 0.05 0.14
Class E Unplanned ECNZ interruption
Class F Unplanned interruption originating from a generator other than ECNZ
Class G Other
NEW ZEALAND GAZETTE
8 SEPTEMBER
2781
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 117
NZLII —
NZ Gazette 1997, No 117
β¨ LLM interpretation of page content
π
Mercury Energy Limited and Subsidiaries Financial Performance Statistics
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, Efficiency Measures, Energy Delivery, Electricity Regulations