β¨ Electricity Reliability Statistics
25 AUGUST NEW ZEALAND GAZETTE 2413
1997 1996 1995
(b) Total number of faults per 100 circuit kilometres prescribed voltage electric lines
9.06 12.57 11.13
(c) Total number of faults per 100 circuit kilometres of underground prescribed voltage electric lines
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| 33 kV | - | - | - |
| 22 kV | - | - | - |
| 11 kV | 3.45 | 4.00 | 2.14 |
| Total | 3.28 | 3.77 | 2.00 |
(d) Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric lines
| 1997 | 1996 | 1995 | |
|---|---|---|---|
| 33 kV | 4.56 | 1.50 | 2.42 |
| 22 kV | 9.38 | - | - |
| 11 kV | 10.01 | 14.54 | 12.65 |
| Total | 9.24 | 12.81 | 11.36 |
(e) The SAIDI for total of interruptions
343.49 215.88 249.11
(f) The SAIDI for total of interruptions within each interruption class
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| Class A | - | 102.28 | 58.22 |
| Class B | 95.41 | - | - |
| Class C | 150.51 | 113.61 | 126.65 |
| Class D | 97.58 | 0 | 64.24 |
| Class E | - | - | - |
| Class F | - | - | - |
| Class G | - | - | - |
(g) The SAIFI for total of interruptions
2.89 1.82 2.21
(h) The SAIFI for total of interruptions within each interruption class
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| Class A | - | - | - |
| Class B | 0.34 | 0.44 | 0.29 |
| Class C | 2.18 | 1.38 | 1.09 |
| Class D | 0.36 | - | 0.83 |
| Class E | - | - | - |
| Class F | - | - | - |
| Class G | - | - | - |
(i) The CAIDI for total of interruptions
119.04 118.44 112.72
(j) The CAIDI for total of interruptions within each interruption class
| Class | 1997 | 1996 | 1995 |
|---|---|---|---|
| Class A | - | - | - |
| Class B | 280.59 | 232.59 | 200.76 |
| Class C | 68.93 | 82.14 | 116.19 |
| Class D | 269.52 | - | 77.40 |
| Class E | - | - | - |
| Class F | - | - | - |
| Class G | - | - | - |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 103
NZLII —
NZ Gazette 1997, No 103
β¨ LLM interpretation of page content
π
Electricity Information Disclosure for Ashburton Limited
(continued from previous page)
π Trade, Customs & Industry13 July 1997
Electricity, System Lengths, Circuit Length, Transformer Capacity, Maximum Demand, Total Electricity Supplied, Customers, Reliability Performance