✨ Energy Efficiency Performance Measures




NEW ZEALAND GAZETTE

No. 98

Electro Power Limited

Regulation 15: Disclosure of energy delivery efficiency performance measures and statistics as at 31 March 1996

  1. Energy Delivery Efficiency Performance Measures
1996 % 1995 %
a) Load Factors 51.5 55.6
b) Loss Ratio 3.8 4.3
c) Capacity Utilisation 44.1 40.3
  1. Statistics

    a) Total system length (km) and breakdown by nominal line voltage.
    b) Underground circuit length (km) and breakdown by nominal line voltage.
    c) Overhead circuit length (km) and breakdown by nominal line voltage.

(c) Overhead Circuit km (b) Underground Circuit km (a) Total System km
1996 1995 1996 1995 1996 1995
33 kV 31.4 31.4 17.7 18.3 49.1 49.7
11 kV 7.5 9.5 120.3 120.5 127.8 130.0
400 V 35.4 45.0 275.0 238.2 310.4 283.2
Total 74.3 85.9 413.0 377.0 487.3 462.9

d) Transformer Capacity

  | 1996      | 1995      |
  |-----------|-----------|
  | 108,700 kVA| 108,700 kVA|

e) Maximum Demand

  | 1996     | 1995      |
  |----------|-----------|
  | 47,908 MW| 43,825 MW |

f) Total Electricity Supplied

  | 1996           | 1995            |
  |----------------|-----------------|
  | 207,646,000 kWh| 204,333,568 kWh |

g) Total amount of electricity conveyed through the system on behalf of an electricity retailer not in a prescribed business relationship with Electro Power Line Business

  | 1996           | 1995      |
  |----------------|-----------|
  | 5,036,000 kWh  | 140,000 kWh|

h) Total Customers

  | 1996   | 1995   |
  |--------|--------|
  | 18,648 | 18,333 |


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 98


NZLII PDF NZ Gazette 1996, No 98





✨ LLM interpretation of page content

🏭 Disclosure of Financial and Efficiency Performance Measures for the Line Business (continued from previous page)

🏭 Trade, Customs & Industry
3 May 1996
Energy Delivery, Efficiency Performance, Statistics, Electro Power Limited, Electricity Supply