- RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS
Total number of Interruptions
Class A TransPower Planned 3 3
Class B Line Owner Planned 129 49
Class C Line Owner Unplanned 121 88
Class D TransPower Unplanned 6 9
Class E Unplanned ECNZ 0 0
Class F Unplanned Other Generator 0 0
Class G Other 0 0
TOTAL 259 149
Number of faults per 100km of prescribed voltage line 5.81 4.27
Number of faults per 100km of prescribed voltage underground line
33 kV system 0 0
11 kV system 4.14 4.03
6.6 kV system 0 0
TOTAL 3.98 3.92
Number of faults per 100km of prescribed voltage overhead line
33 kV system 0.83 0
11 kV system 6.34 4.54
6.6 kV system 0 0
TOTAL 5.9 4.28
CLASSIFICATION OF INTERRUPTIONS SAIDI SAIDI
Min/Con-Cust Min/Con-Cust
Class A TransPower Planned 65.06 9
Class B Line Owner Planned 101.01 24
Class C Line Owner Unplanned 127.48 123
Class D TransPower Unplanned 25.82 61
Class E Unplanned ECNZ 0 0
Class F Unplanned Other Generator 0 0
Class G Other 0 0
TOTAL 319.37 217
CLASSIFICATION OF INTERRUPTIONS SAIFI SAIFI
Int/Con-Cust Int/Con-Cust
Class A TransPower Planned 0.204 0.05
Class B Line Owner Planned 0.667 0.14
Class C Line Owner Unplanned 1.369 1.3
Class D TransPower Unplanned 0.841 1.71
Class E Unplanned ECNZ 0 0
Class F Unplanned Other Generator 0 0
Class G Other 0 0
TOTAL 3.081 3.2
CLASSIFICATION OF INTERRUPTIONS CAIDI CAIDI
Min/Cust-Int Min/Cust-Int
Class A TransPower Planned 318.74 180
Class B Line Owner Planned 151.38 174
Class C Line Owner Unplanned 93.07 95
Class D TransPower Unplanned 30.69 36
Class E Unplanned ECNZ 0 0
Class F Unplanned Other Generator 0 0
Class G Other 0 0
TOTAL 103.66 68
- VALUATION OF ASSETS TO BE DISCLOSED BY LINE OWNERS
ODV of Line Owner Assets 31 March 1995 $90,390,084
PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP PRINT LIMITED, WELLINGTON, NEW ZEALAND—1996
ISSN 0111-5650
Price $3.95 (inc. G.S.T.)
74746—96A
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 96
NZLII —
NZ Gazette 1996, No 96
✨ LLM interpretation of page content
💰
Tasman Energy Limited Financial Performance
(continued from previous page)
💰 Finance & RevenueFinancial Statements, Term Liabilities, Commitments, Contingent Liabilities, Reserve Bank Loans
🌾 Reliability Performance Measures for Line Owners
🌾 Primary Industries & ResourcesEnergy, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI, CAIDI
💰 Valuation of Assets by Line Owners
💰 Finance & RevenueValuation, Assets, Line Owners