β¨ Reliability Performance Measures
NEW ZEALAND GAZETTE
No. 90
Reliability Performance Measures
1996 | 1995
- Interruptions (excluding interruptions caused by operation of 11kV transformer fuses and affecting only up to 3 customers)
| 1996 | 1995 | |
|---|---|---|
| A. TransPower - Planned Shutdowns | 0 | 0 |
| B. Electricity Distributor - Planned Shutdowns | 350 | 290 |
| C. Electricity Distributor - Unplanned Cuts | 369 | 300 |
| D. TransPower - Unplanned Cuts | 12 | 4 |
| E. ECNZ Generator - Unplanned Cuts | 0 | 0 |
| F. Other Distributor or Generator - Unplanned Cuts | 0 | 0 |
| G. Other Distributor or Generator - Planned Shutdowns | 0 | 0 |
Total all interruptions | 731 | 594 |
-
Total faults per 100 kilometres: 14.4 | 12.1 |
-
Underground faults per 100km
| Voltage | 1996 | 1995 |
|---|---|---|
| 33kV | 0 | 0 |
| 11kV | 4.8 | 33.3 |
Total all voltages: | 4.8 | 33.3 |
- Overhead faults per 100km
| Voltage | 1996 | 1995 |
|---|---|---|
| 33kV | 16.7 | 9.8 |
| 11kV | 15.0 | 12.3 |
Total all voltages: | 14.5 | 12.1 |
- System performance indices:
1996
| Class | SAIDI (As in 1. above) (System Average Interruption Duration Index) |
SAIFI (System Average Interruption Frequency Index) |
CAIDI (Customer Average Interruption Duration Index) |
|---|---|---|---|
| A. | 0 | 0 | - |
| B. | 331.05 | 1.68 | 196.73 |
| C. | 370.15 | 9.08 | 40.76 |
| D. | 13.71 | 0.27 | 51.37 |
| E. | 0 | 0 | - |
| F. | 0 | 0 | - |
| G. | 0 | 0 | - |
| Total | 714.92 | 11.03 | 64.81 |
1995
| Class | SAIDI (As in 1. above) (System Average Interruption Duration Index) |
SAIFI (System Average Interruption Frequency Index) |
CAIDI (Customer Average Interruption Duration Index) |
|---|---|---|---|
| A. | 0 | 0 | - |
| B. | 398.7 | 1.52 | 262.33 |
| C. | 468.8 | 7.59 | 61.77 |
| D. | 18.8 | 0.47 | 40.04 |
| E. | 0 | 0 | - |
| F. | 0 | 0 | - |
| G. | 0 | 0 | - |
| Total | 886.4 | 9.59 | 92.43 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 90
NZLII —
NZ Gazette 1996, No 90
β¨ LLM interpretation of page content
π
Energy Efficiency Performance Measures and Statistics
(continued from previous page)
π Trade, Customs & Industry23 August 1996
Energy efficiency, performance measures, statistics, electricity delivery, system length, circuit length, transformer capacity, maximum demand, electricity supply, customers
π Reliability Performance Measures
π Trade, Customs & IndustryReliability, performance measures, interruptions, faults, system performance indices, electricity distribution