✨ Electricity Performance Measures




21 AUGUST
NEW ZEALAND GAZETTE
2309

PERFORMANCE MEASURES AND OTHER INFORMATION - PART III
Regulation 15

Energy Delivery Efficiency Performance Measures and Statistics

  1. ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES:

(a) Load Factor - 45.9% 44%
(b) Loss Ratio - 6.7% 7%
(c) Capacity Utilisation - 13.8% 16%

  1. STATISTICS:

(a) System Length - 2280 km 2288 km
33kV - 209 km 209 km
11kV - 1603 km 1610 km
230-400V - 467 km 469 km

(b) Total Circuit Length - 2116 km (Overhead) 2123 km (Overhead)
33kV - 209 km 209 km
11kV - 1513 km 1544 km
230-400V - 371 km 370 km

(c) Total Circuit Length - 163 km (Underground) 165 km (Underground)
33kV - 0 km -
11kV - 68 km 66 km
230-400V - 95 km 99 km

(d) Transformer Capacity - 214,690 kVA 219,200 kVa

(e) Maximum Demand - 29,782 kW 33,950 KW

(f) Total Electricity Supplied - 119,865,119 kWh 122,163,284 kWh

(g) Total Electricity Conveyed on Behalf of Others 112,384 kWh -

(h) Total Number of Customers - 12,765 12,987

PERFORMANCE MEASURES AND OTHER INFORMATION - PART IV
Regulation 16

Reliability Performance Measures to be Disclosed by Line

  1. TOTAL NUMBER OF INTERRUPTIONS:

Class A 1 0
Class B 78 37
Class C 350 511
Class D 10 7
Class E 0 0
Class F 0 0
Class G 0 0
Total 439 555

  1. TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM

Total 19 15
33kV 6 1
11 kV 13 14
(This breakdown is an estimate)

  1. TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM OF UNDERGROUND CABLE

Total - 4 20
11kV - 4 20
33 kV - 0 0



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 87


NZLII PDF NZ Gazette 1996, No 87





✨ LLM interpretation of page content

πŸ’° King Country Energy Limited Financial Performance Measures Certification (continued from previous page)

πŸ’° Finance & Revenue
8 August 1996
Financial Performance, Efficiency Measures, Electricity Regulations, Auditor Certification

πŸ—οΈ Energy Delivery Efficiency Performance Measures and Statistics

πŸ—οΈ Infrastructure & Public Works
Load Factor, Loss Ratio, Capacity Utilisation, System Length, Transformer Capacity, Electricity Supply

πŸ—οΈ Reliability Performance Measures by Line

πŸ—οΈ Infrastructure & Public Works
Interruptions, Faults, Circuit KM, Underground Cable