✨ Energy Efficiency Performance Measures




4670

NEW ZEALAND GAZETTE
No. 178

THE POWER COMPANY

ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

PURSUANT TO REGULATION 15
ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

(1) ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

1996 1995
(a) Maximum Demand 99,205 kW 94,517 kW
(b) Total kWh Received 535,239,443 kWh 529,593,400 kWh
(c) Total kWh Delivered 477,237,204 kWh 489,845,671 kWh
(d) Total kWh Conveyed 19,641,908 kWh 11,543,308 kWh
(e) Load Factor
Percentage of electrical energy entering the
transmission system over maximum demand time
hours per year.
62% 64%
(f) Loss Ratio
Transmission losses over energy entering the system.
11% 8%
(g) Capacity Utilisation
Maximum demand over total transformer capacity
38% 40%

(2) STATISTICS

System length, broken by voltage.

Total (km) Overhead (km) Underground (km)
1996 1995 1996 1995 1996 1995
66kV 239.30 239.30 239.30 239.30
33kV 468.85 468.85 468.10 468.1 0.75 0.75
11kV 6441.08 6435.12 6399.26 6394.56 41.82 40.56
6.6kV 0.59 0.59 0.59 0.59
400V 1107.87 1107.22 1012.11 1011.46 95.76 95.76
Total 8257.69 8251.08 8118.77 8113.42 138.92 137.66
1996 1995
Average Transformer Capacity 260,772 kVA 239,249 kVA


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 178


NZLII PDF NZ Gazette 1996, No 178





✨ LLM interpretation of page content

πŸ’° Financial and Efficiency Performance Measures for The Power Company Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Measures, Efficiency Performance, Accounting Return, Direct Line Costs, Indirect Line Costs, Electricity, Energy Business, Regulation 6(6), ODV Valuation