β¨ Electricity Performance Statistics
4048 NEW ZEALAND GAZETTE No. 152
ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS
FOR THE YEAR ENDED 31 MARCH 1995
Pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:
-
Energy Delivery Efficiency Performance Measures and Statistics
(a) Load Factor 65.26%
(b) Loss Ratio 5.13%
(c) Capacity Utilisation 31.35% -
Statistics
(a)
System Length (km) Underground Overhead Total >11kV 3 301 304 11kV 152 2,433 2,585 <11kV 205 346 551 Total 360 3,080 3,440 (d) Transformer Capacity 250,000 kVA
(e) Maximum Demand 78,370 kW
(f) Electricity Supplied 425 GWH
(g) Electricity Conveyed for Unrelated Parties 100 GWH
(h) Total Customers at 31/3/95 27,100
RELIABILITY PERFORMANCE MEASURES
Pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:
-
Number of Interruptions:
Class A 4
Class B 22
Class C 106 Includes an estimate of 3 U/G
Class D 1
Total 133 -
Faults/100km 3.08
-
Faults/100km U/G 0.83 Assumes all 11kV
-
Faults/100km O/H 3.34 Assumes all 11kV
| A | B | C | D | Total | |
|---|---|---|---|---|---|
| SAIDI | 5,6 | 54 | 19 | 66 | 1 |
| SAIFI | 7,8 | 0.19 | 0.14 | 1.1 | 0.03 |
| CAIDI | 9,10 | 280 | 129 | 60 | 40 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 152
NZLII —
NZ Gazette 1996, No 152
β¨ LLM interpretation of page content
π
Energy Delivery Efficiency Performance Measures and Statistics for Alpine Energy Limited
(continued from previous page)
π Trade, Customs & IndustryEnergy Delivery, Efficiency, Statistics, Electricity, Alpine Energy, 1995
π Reliability Performance Measures for Alpine Energy Limited
π Trade, Customs & IndustryReliability, Performance Measures, Electricity, Alpine Energy, 1995