4048 NEW ZEALAND GAZETTE No. 152

ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

FOR THE YEAR ENDED 31 MARCH 1995

Pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:

  1. Energy Delivery Efficiency Performance Measures and Statistics

    (a) Load Factor 65.26%
    (b) Loss Ratio 5.13%
    (c) Capacity Utilisation 31.35%

  2. Statistics

    (a)

    System Length (km) Underground Overhead Total
    >11kV 3 301 304
    11kV 152 2,433 2,585
    <11kV 205 346 551
    Total 360 3,080 3,440

    (d) Transformer Capacity 250,000 kVA
    (e) Maximum Demand 78,370 kW
    (f) Electricity Supplied 425 GWH
    (g) Electricity Conveyed for Unrelated Parties 100 GWH
    (h) Total Customers at 31/3/95 27,100

RELIABILITY PERFORMANCE MEASURES

Pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:

  1. Number of Interruptions:

    Class A 4
    Class B 22
    Class C 106 Includes an estimate of 3 U/G
    Class D 1
    Total 133

  2. Faults/100km 3.08

  3. Faults/100km U/G 0.83 Assumes all 11kV

  4. Faults/100km O/H 3.34 Assumes all 11kV

A B C D Total
SAIDI 5,6 54 19 66 1
SAIFI 7,8 0.19 0.14 1.1 0.03
CAIDI 9,10 280 129 60 40


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 152


NZLII PDF NZ Gazette 1996, No 152





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics for Alpine Energy Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency, Statistics, Electricity, Alpine Energy, 1995

🏭 Reliability Performance Measures for Alpine Energy Limited

🏭 Trade, Customs & Industry
Reliability, Performance Measures, Electricity, Alpine Energy, 1995