✨ Reliability Performance Measures




NEW ZEALAND GAZETTE

No. 152

ALPINE ENERGY LIMITED

RELIABILITY PERFORMANCE MEASURES

FOR THE YEAR ENDED 31 MARCH 1996

Pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:

  1. Number of Interruptions:

    • Class A: 3
    • Class B: 12
    • Class C: 79 Includes an estimate of 3 U/G
    • Class D: 7
    • Total: 101
  2. Faults/100km: 2.23

  3. Faults/100km U/G

    • 11kV: 0.82
    • 22kV: 0.0
    • 33kV: 0.0
    • Total: 0.82
  4. Faults/100km O/H

    • 11kV: 2.8
    • 22kV: 2.3
    • 33kV: 2.3
    • Total: 2.4
A B C D E F G Total
5,6 SAIDI 182
37 14 58 73 0 0 0
7,8 SAIFI 2.66
0.11 0.04 0.72 1.79 0 0 0
9,10 CAIDI 69
334 383 81 41 0 0 0


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 152


NZLII PDF NZ Gazette 1996, No 152





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Electricity, Alpine Energy, 1996