11 OCTOBER NEW ZEALAND GAZETTE 3525

CITIPOWER LIMITED

Disclosure of Energy Delivery Efficiency Performance Measures and Statistics Pursuant to Regulation 15 and Part II of the First Schedule of the Electricity (Information Disclosure) Regulations 1994.

Energy Delivery Efficiency Performance Measures: Period : 1 April 1995 - 31 March 1996

Load Factor: 1995/6 1994/5
a x 100 = 57.5% 56.8%
b x c 1
Loss Ratio:
a x 100 = 5.0% 5.5%
b 1
Capacity Utilisation:
a x 100 = 39.1% 40.7%
b 1

Statistics - Period : 1 April 1995 - 31 March 1996

Kilometres 1994/5 Kilometres
33kV
System length breakdown 12.1
Underground circuit length 9.9
Overhead circuit length 2.1
11kV
System length breakdown 78.5
Underground circuit length 67.3
Overhead circuit length 11.2
400V
System length breakdown 114.1
Underground circuit length 84.6
Overhead circuit length 27.4
Total
System length breakdown 204.7
Underground circuit length 161.9
Overhead circuit length 42.7

| Transformer capacity | 71,820 kVA |
| Maximum demand | 28,100 kilowatts |
| Total electricity supplied | 141,566,178 kilowatt-hours |
| Total electricity conveyed for non-associated parties | 0 kilowatt-hours |
| Total customers | 8,322 |
| | 66,815 kVA |
| | 27,200 kilowatts |
| | 135,441,303 kilowatt-hours |
| | 0 kilowatt-hours |
| | 8,242 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 147


NZLII PDF NZ Gazette 1996, No 147





✨ LLM interpretation of page content

🏭 Citipower Limited Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)