β¨ Electricity Reliability Performance Measures
20 SEPTEMBER NEW ZEALAND GAZETTE 3121
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
| 1996 | 1995 | |
|---|---|---|
| 1. Total number of interruptions | ||
| B - planned by line owner | 229 | 217 |
| C - unplanned by line owner | 258 | 225 |
| D - unplanned by TransPower | 0 | 4 |
| A, E, F + G | 0 | 0 |
| TOTAL | 487 | 446 |
| 2. Total number of faults per 100 circuit kilometres of prescribed voltage electric line |
| TOTAL | 12.57 | 11.13 |
| 33kV | 1.49 | 2.39 |
| 11kV | 14.25 | 12.37 |
| 3. Total number of faults per 100 circuit kilometres of underground prescribed voltage electric line |
| TOTAL | 3.77 | 2.00 |
| 33kV | 0 | - |
| 11kV | 4.00 | 2.14 |
| 4. Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line |
| TOTAL | 12.81 | 11.36 |
| 33kV | 1.50 | 2.42 |
| 11kV | 14.54 | 12.65 |
| 5. The SAIDI for the total of interruptions |
| | 215.88 | 249.11 |
| 6. The SAIDI within each interruption class |
| B - planned by line owner | 102.28 | 58.22 |
| C - unplanned by line owner | 113.61 | 126.65 |
| D - unplanned by TransPower | 0.00 | 64.24 |
| A, E, F + G | 0.00 | 0.00 |
| 7. The SAIFI for the total number of interruptions |
| | 1.82 | 2.21 |
| 8. The SAIFI within each interruption class |
| B - planned by line owner | 0.44 | 0.29 |
| C - unplanned by line owner | 1.38 | 1.09 |
| D - unplanned by Transpower | 0.00 | 0.83 |
| A, E, F + G | 0.00 | 0.00 |
| 9. The CAIDI for the total of all interruptions |
| | 118.44 | 112.72 |
| 10. The CAIDI within each interruption class |
| B - planned by line owner | 232.59 | 200.76 |
| C - unplanned by line owner | 82.14 | 116.19 |
| D - unplanned by Transpower | 0.00 | 77.40 |
| A, E, F + G | 0.00 | 0.00 |
CERTIFICATION OF FINANCIAL STATEMENTS, PERFORMANCE MEASURES, AND STATISTICS PURSUANT TO REGULATION 26 (2) OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
We, Edwin Glass and Donald George Church, directors of Electricity Ashburton Limited certify that, having made all reasonable enquiry, to the best of our knowledge,
(a) The attached audited financial statements of Electricity Ashburton Ltd, prepared for the purposes of Regulation 6 of the Electricity (Information Disclosure) Regulations 1994, give a true and fair view of the matters to which they related and comply with the requirements of those regulations; and
(b) The attached information, being financial performance measures, efficiency performance measures, energy delivery efficiency performance measures, statistics, and reliability performance measures in relation to Electricity Ashburton Limited, and having been prepared for the purposes of regulations 13, 14, 15, and 16 of the Electricity (Information Disclosure) Regulations 1994, comply with the requirements of the Electricity (Information Disclosure) Regulations 1994.
The valuations on which those financial performance measures are based are as at 1 April 1994 adjusted for depreciation.
...................................................................................
E Glass
D G Church
13 August 1996
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 124
NZLII —
NZ Gazette 1996, No 124
β¨ LLM interpretation of page content
π
Electricity Reliability Performance Measures for Ashburton Limited
(continued from previous page)
π Trade, Customs & Industry13 August 1996
Electricity, Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Ashburton Limited
- Edwin Glass, Director
- Donald George Church, Director