✨ Energy Reliability Performance Statistics




NEW ZEALAND GAZETTE

No. 123

RELIABILITY PERFORMANCE MEASURES

1995 - 1996 1994 - 1995

CATEGORY OF CAUSE OF INTERRUPTION NO. OF INT. NO. OF INT.
A Planned Transpower 0 0
B Planned Distributor 21 57
C Unplanned Distributor 68 117
D Unplanned Transpower 1 0
E Unplanned ECNZ 0 0
F Unplanned Generator 0 0
G Unplanned Other 0 0
Total 90 174

1995 - 1996

11kV Network Length (km)

Overhead Line Underground Cable Total
1491.022 17.387 1508.409
Number of Faults 86 2 88
Faults / 100km 5.768 11.503 5.834

33kV Network Length (km)

Overhead Line Underground Cable Total
137.885 0.278 138.163
Number of Faults 2 0 2
Faults / 100km 1.450 0.000 1.448

Total Network Length (km)

Overhead Line Underground Cable Total
1628.907 17.665 1646.572
Number of Faults 88 2 90
Faults / 100km 5.402 11.322 5.466

1994 - 1995

11kV Network Length (km)

Overhead Line Underground Cable Total
1488.443 16.839 1505.282
Number of Faults 167 6 173
Faults / 100km 11.220 35.632 11.493

33kV Network Length (km)

Overhead Line Underground Cable Total
137.856 0.148 138.004
Number of Faults 1 0 1
Faults / 100km 0.725 0.000 0.725

Total Network Length (km)

Overhead Line Underground Cable Total
1626.299 16.987 1643.286
Number of Faults 168 6 174
Faults / 100km 10.330 35.321 10.589


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 123


NZLII PDF NZ Gazette 1996, No 123





✨ LLM interpretation of page content

🏭 Waitaki Power Limited Financial Performance Statement (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Income, Expenses, Surplus, Tax, Equity, Assets, Liabilities, Efficiency Measures, Energy Delivery, Statistics

🏭 Reliability Performance Measures for Energy Networks

🏭 Trade, Customs & Industry
Energy, Reliability, Performance, Interruptions, Faults, Network Length, Overhead Line, Underground Cable, Statistics