✨ Performance Indicators for Scanpower Limited




17 SEPTEMBER

NEW ZEALAND GAZETTE

SCANPOWER LIMITED

PERFORMANCE INDICATORS

FOR THE YEAR ENDED: 31 MARCH 1996

1996 1995
1. FINANCIAL PERFORMANCE MEASURES
Accounting Return on Total Assets -1.44% -1.67%
Accounting Return on Equity -1.55% -1.95%
Accounting Rate of Profit -1.54% -1.83%

| 2. EFFICIENCY PERFORMANCE INDICATORS | | |
| Direct Line Costs per Kilometre | $866 | $693 |
| Indirect Line Costs per Customer | $57 | $61 |

| 3. ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES | | |
| Load Factor | 66.55% | 64.11% |
| Loss Ratio | 7.95% | 7.79% |
| Capacity Utilisation | 26.04% | 26.06% |

| 4. STATISTICS | | |
| Circuit Length of Overhead System | | |
| 11 KV | 765 | 789 |
| 400 V | 197 | 189 |
| Total | 962 | 978 |

| Circuit Length of Underground System | | |
| 400 V | 32 | 31 |
| Total | 32 | 31 |

| System Length | | |
| 11 KV | 765 | 789 |
| 400 V | 229 | 220 |
| Total | 994 | 1,009 |

| Transformer Capacity | 54,425 | 54,055 |
| Maximum Demand KW | 14,176 | 14,089 |
| Total Electricity Supplied from Systems (Sales) Kwhyr | 76,281,299 | 72,965,022 |
| Electricity on behalf of other entities | - | - |
| Total Customers | 6,700 | 6,713 |

| Number of Faults per 100 circuit kilometre overhead |
| 11 KV | 9 | 11 |
| Total | 9 | 11 |

Total Interruptions 1996

CLASS A B C D E F G TOTAL
SAIDI 49.15 41.66 32.63 0 0 0 0 123.44
SAIFI 0.23 0.3224 0.579 0 0 0 0 1.1314
CAIDI 214 129 56 0 0 0 0 109
INTERRUPTION 1 127 68 0 0 0 0 196

Total Interruptions 1995

CLASS A B C D E F G TOTAL
SAIDI 56 32 41.4 31 0 0 0 160.4
SAIFI 0.234 0.476 0.708 1.91 0 0 0 3.328
CAIDI 240 67 58 16 0 0 0 48
INTERRUPTION 1 88 84 5 0 0 0 178


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 121


NZLII PDF NZ Gazette 1996, No 121





✨ LLM interpretation of page content

🏭 Financial Performance Measures for Scanpower Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Financial Performance, Revenue, Expenses, Taxation, Efficiency, Energy Delivery, Circuit Length, System Length, Transformer Capacity, Maximum Demand, Electricity Supply, Faults, Interruptions