β¨ Energy Delivery Statistics
2964
NEW ZEALAND GAZETTE
No. 117
(c) The total circuit length (in kilometres) of the overhead electric lines that form part of the system (which length is calculated on the same basis as system length is calculated), together with a breakdown of that length according to different nominal line voltages:
1996 1995
33kV 4 7
11kV 16 14
400V 38 30
58 51
(d) Transformer capacity, in kilovolt amperes: 112,500
(1995 - 117,000)
(e) Maximum demand, in kilowatts: 49,196
(1995 - 48,917)
(f) Total electricity supplied from the system in kilowatt hours: 252,138,614
(1995 - 239,431,088)
(g) The total amount of electricity (in kilowatt hours) conveyed through the system during the relevant financial year on behalf of other persons that are electricity generators or electricity retailers, or both, not being persons that are in a prescribed business relationship with the line owner 709,451
(1995 - 262,760)
(h) Total customers: 12,386
(1995 - 12,494)
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 117
NZLII —
NZ Gazette 1996, No 117
β¨ LLM interpretation of page content
π
Disclosure of Energy Delivery Efficiency Measures and Statistics
(continued from previous page)
π Trade, Customs & IndustryElectricity, Energy Delivery, Efficiency, Load Factor, Statistics, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Customers