β¨ Electricity Performance Measures
2962 NEW ZEALAND GAZETTE No. 117
-
The CAIDI for the total of all interruptions, which shall be calculated in accordance with the following formula:
a --- b
where:-
a is the sum obtained by adding together the interruption duration factors for all interruptions
b is the sum obtained by adding together the number of electricity customers affected by each of those interruptions
53.01 (1995 - 50.09)
-
The CAIDI for the total of all interruptions within each interruption class, which shall be calculated in accordance with the following formula:
a --- b
where:-
a is the sum obtained by adding together the interruption duration factors for all interruptions within the particular interruption class
b is the sum obtained by adding together the number of electricity customers affected by each of those interruptions
1996 1995
Classes A, E-G 0 0
Class B 126.91 108.27
Class C 42.02 33.11
Class D 38.21 0
TOTAL 207.14 141.38
Disclosure of energy delivery efficiency measures and statistics pursuant to regulation 15 of the Electricity (Information Disclosure) Regulations 1994
-
Energy delivery efficiency performance measures
(a) Load factor, which is calculated in accordance with the following formula:
a --- x 100% b x c
where:-
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 117
NZLII —
NZ Gazette 1996, No 117
β¨ LLM interpretation of page content
π
Disclosure of Reliability Performance Measures for Electricity
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability, Interruptions, Faults, CAIDI, Performance Measures
π Disclosure of Energy Delivery Efficiency Measures and Statistics
π Trade, Customs & IndustryElectricity, Energy Delivery, Efficiency, Load Factor, Statistics