β¨ Electricity Reliability Performance Measures
2960 NEW ZEALAND GAZETTE
No. 117
a is indirect expenditure (in dollars)
b is total customers
$100 (1995 - $142)
Disclosure of reliability performance measures pursuant to regulation 16 Electricity (Information Disclosure) Regulations 1994
- Total number of interruptions, together with a breakdown of that total according to interruption class
| 1996 | 1995 | |
|---|---|---|
| Classes A, E-G | 0 | 0 |
| Class B | 227 | 260 |
| Class C | 325 | 459 |
| Class D | 3 | 0 |
| TOTAL | 555 | 719 |
-
Total number of faults per 100 circuit kilometres of prescribed voltage electric line
32.77 (1995 - 50.64)
-
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different line voltages
| 1996 | 1995 | |
|---|---|---|
| 33kV | 0 | 0 |
| 11kV | 12.5 | 6.93 |
| Overall | 10.0 | 4.69 |
- The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different line voltages
| 1996 | 1995 | |
|---|---|---|
| 33kV | 7.64 | 3.36 |
| 11kV | 37.52 | 59.40 |
| Overall | 33.10 | 51.44 |
-
The SAIDI for the total of interruptions, is calculated in accordance with the following formula:
aSAIDI = -
b
where:-
a is the sum obtained by adding together the interruption duration factors for all interruptions
b is the total customers
333.66 (1995 - 250.91)
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 117
NZLII —
NZ Gazette 1996, No 117
β¨ LLM interpretation of page content
π
Financial Performance Measures for Egmont Electricity Limited
(continued from previous page)
π Trade, Customs & IndustryAccounting return, Total assets, Equity, Rate of profit, Efficiency performance, Direct line costs, Indirect line costs, Electricity, Egmont Electricity Limited
π Disclosure of Reliability Performance Measures for Electricity
π Trade, Customs & IndustryElectricity, Reliability, Interruptions, Faults, SAIDI, Performance Measures