✨ Trustpower Performance Measures




NEW ZEALAND GAZETTE

No. 111

TRUSTPOWER LIMITED AND SUBSIDIARIES

INFORMATION DISCLOSURE LINE OWNERS

FOR THE 12 MONTHS ENDED 31 MARCH 1996

REG #
16(1)
1ST SCH
Part IV

Reliability Performance Measures:

1996 1995
  1. Total Number of Interruptions

    • Class B | 187 | 247 |
    • Class C | 265 | 144 |
    • Class D | 8 | 0 |
    • All Other Classes | 0 | 0 |
    • Total | 460 | 391 |
  2. Total number of faults per 100 Km of prescribed voltage electric line | 7.48 | 21.75 |

  3. Total number of faults per 100 Km of underground prescribed voltage electric line by nominal line voltage.

    • Total | 7.70 | 3.15 |
    • 33Kv | 0 | 0 |
    • 11Kv | 7.88 | 3.16 |
  4. Total number of faults per 100 Km of overhead prescribed voltage electric line by nominal line voltage

    • Total | 6.90 | 25.84 |
    • 33Kv | 2.34 | 12.68 |
    • 11Kv | 7.16 | 8.67 |
  5. SAIDI for total number of interruptions | 192.94 | 302.71 |

  6. SAIDI for total number of interruptions within each interruption class.

    • Class B | 36.87 | 136.87 |
    • Class C | 138.83 | 165.84 |
    • Class D | 17.24 | 0 |
  7. SAIFI for total number of interruptions | 3.015 | 3.34 |

  8. SAIFI for total number of interruptions within each interruption class.

    • Class B | 0.212 | 0.76 |
    • Class C | 2.42 | 2.58 |
    • Class D | 0.38 | 0 |
  9. CAIDI for total of all interruptions | 63.98 | 90.67 |

  10. CAIDI for total of all interruptions within each interruption class.

    • Class B | 173.89 | 180.61 |
    • Class C | 57.36 | 64.26 |
    • Class D | 45.02 | 0 |


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 111


NZLII PDF NZ Gazette 1996, No 111





✨ LLM interpretation of page content

πŸ’° Trustpower Limited Reliability Performance Measures (continued from previous page)

πŸ’° Finance & Revenue
Reliability, Performance Measures, Electricity, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Trustpower