✨ Electricity Information Disclosure




6 SEPTEMBER NEW ZEALAND GAZETTE 2781

ELECTRICITY [Information Disclosure] REGULATIONS 1994

PART III - Energy Delivery Efficiency Performance Measures and Statistics

  1. Energy Delivery Efficiency Performance Measures
1995/96 1994/95
a) Load Factor 57.13 % 58.29 %
b) Loss Ratio 5.55 % 5.22 %
c) Capacity Utilisation 29.08 % 29.02 %
  1. Statistics

    a) System length

     3,621 km Total              3,532 km Total
     33kV line length    246 km          244 km
     11kV line length    2,127 km        2,059 km
     230/400V line length    1,248 km        1,229 km

    b) Overhead

     2,682 km Total              2,619 km Total
     33kV                227 km          227 km
     11kV                1,816 km        1,756 km
     230/400V            639 km          636 km

    c) Underground

     939 km Total                913 km Total
     33kV                19 km           17 km
     11kV                311 km          303 km
     230/400V            609 km          593 km

    d) Transformer capacity 502,791 kVA 495,850 kVA

    e) Maximum Demand 148,823 kW 143,916 kW

    f) Total electricity supplied
    from system 706,214,060 kWh 696,245,703 kWh

    g) Nil Nil

    h) Customers 54,907 53,931

PART IV Reliability Performance Measure for 1995/96

The Interruption Disclosure requirements are stated as:

Class 1995/96 1994/95
Class A Planned shutdown caused by Transpower 0 0
Class B " " Distribution system 308 400
Class C Unplanned shutdown caused by Distribution system 222 287
Class D " " Transpower 0 0
Class E Unplanned caused by ECNZ as generator 0 0
Class F " " Generation not ECNZ 0 0
Class G Planned or unplanned shutdown any other cause 0 0

Total Shutdowns: 530 | 687 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 107


NZLII PDF NZ Gazette 1996, No 107





✨ LLM interpretation of page content

πŸ’° Audit Report on Hawke's Bay Power Distribution Ltd Financial Performance (continued from previous page)

πŸ’° Finance & Revenue
9 August 1996
Audit, Financial Performance, Electricity, Information Disclosure, Hawke's Bay Power Distribution Ltd

🌾 Electricity Information Disclosure Regulations 1994 - Energy Delivery Efficiency Performance Measures

🌾 Primary Industries & Resources
Electricity, Energy Delivery, Efficiency, Load Factor, Loss Ratio, Capacity Utilisation

🌾 Electricity Information Disclosure Regulations 1994 - Statistics

🌾 Primary Industries & Resources
Electricity, Statistics, System Length, Overhead, Underground, Transformer Capacity, Maximum Demand, Electricity Supplied, Customers

🌾 Electricity Information Disclosure Regulations 1994 - Reliability Performance Measure

🌾 Primary Industries & Resources
Electricity, Reliability, Interruption Disclosure, Planned Shutdown, Unplanned Shutdown