✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 103

BULLER ELECTRICITY LIMITED

PERFORMANCE MEASURES

YEAR ENDED MARCH 31 1996

  1. RELIABILITY PERFORMANCE MEASURES
1996 1995
1. Total Number of Interruptions 184 166
Class A 0 0
Class B 38 33
Class C 144 131
Class D 2 2
Class E 0 0
Class F 0 0
Class G 0 0
  1. Total Number of Faults per 100 circuit KM of Electric Line ... 32.38 ... 31.50

  2. Total Number of Faults per 100 circuit KM of Underground Line 11KV ... 0 ... 16.81

  3. Total Number of Faults per 100 circuit KM of Overhead Line

33KV 0
11KV 33.09

| | 55.3 | 30.91|

  1. The SAIDI for the total of Interruptions ... 649.91 ... 575.8

  2. The SAIDI for the total number of Interruptions within each Interruption Class

1996 1995
Class A 0 0
Class B 397.08 224.74
Class C 211.0 331.94
Class D 41.83 19.12
Class E 0 0
Class F 0 0
Class G 0 0
  1. The SAIFI for the total number of Interruptions ... 3.81 ... 4.74

  2. The SAIFI for the total number of Interruptions within each Interruption Class

1996 1995
Class A 0 0
Class B 1.66 0.69
Class C 1.15 3.04
Class D 1.00 1.00
Class E 0 0
Class F 0 0
Class G 0 0
  1. The CAIDI for the total of all Interruptions ... 170.41 ... 148.88

  2. The CAIDI for the total number of Interruptions within each Interruption Class

1996 1995
Class A 0 0
Class B 239.04 323.42
Class C 183.05 109.04
Class D 41.83 19.12
Class E 0 0
Class F 0 0
Class G 0 0
  1. Disclosure of ODV Valuation
  • Line Business Asset Value ... $12.93 Million


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 103


NZLII PDF NZ Gazette 1996, No 103





✨ LLM interpretation of page content

πŸ’° Certification of Performance Measures by Auditors (continued from previous page)

πŸ’° Finance & Revenue
13 August 1996
Audit, Performance Measures, Financial Performance, Efficiency Performance, Electricity (Information Disclosure) Regulations 1994, Buller Electricity Limited