  1. Total number of interruptions, together with a breakdown of that total according to interruption class.
Interruption Class Number of Interruptions 1996 1995
MainPower
Planned Shut-Down (Class B) 220 257
Unplanned Interruption (Class C) 437 359
Trans Power
Planned Shut-Down (Class A) 1 2
Unplanned Interruption (Class D) - 2
Generation ECNZ
Unplanned Interruption (Class E) - -
Generation Other
Unplanned Interruption (Class F) - -
Other
Other Interruptions (Class G) - 40
Unplanned Interruption (Class G) - -
Total Interruptions 658 660
  1. The total number of faults per 100 circuit kilometres of prescribed voltage electric line.

13.29 Faults 11.92 Faults

  1. The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Nominal Voltage Faults per 100 km 1996 1995
33 kV - 93.02
11 kV 6.97 4.69
TOTAL 6.77 7.56
  1. The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Nominal Voltage Faults per 100 km 1996 1995
33 kV 3.63 7.70
11 kV 14.11 12.26
TOTAL 13.32 11.92
  1. The SAIDI for the total of interruptions:

415.58 351.33

  1. The SAIDI for the total number of interruptions within each interruption class:
Network or Generation Owner Classification Minutes per Connected Customer 1996 1995
MainPower Planned Shut-Down (Class B) 141.47 124.79
Unplanned Interruption (Class C) 244.24 144.33
Trans Power Planned Shut-Down (Class A) 29.87 4.91
Unplanned Interruption (Class D) - 58.61
Generation ECNZ Unplanned Interruption (Class E) - -
Generation Other Unplanned Interruption (Class F) - -
Other Other Interruptions (Class G) - 18.69
Unplanned Interruption (Class G) - -
  1. The SAIFI for the total number of interruptions:

2.90 5.02



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 101


NZLII PDF NZ Gazette 1996, No 101





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures for MainPower New Zealand Ltd (continued from previous page)

🏭 Trade, Customs & Industry
Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, Electricity, MainPower