23. RELIABILITY PERFORMANCE MEASURES (continued)
| Interruption Class | Number | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|
| A Planned Interruption by Trans Power | 2,726 | 56.92 | 0.50 | 114.5 |
| B Planned Interruption by Other Line Owner | 6,600 | 201.01 | 1.20 | 167.0 |
| C Unplanned Interruption by Other Line Owner | 10,258 | 250.44 | 1.87 | 133.9 |
| D Unplanned Interruption by Trans Power | 298 | 0.27 | 0.05 | 5.0 |
| E Unplanned Interruption by ECNZ | ||||
| F Unplanned Interruption by any other generator | ||||
| G Unplanned Interruption not resulting from above | ||||
| Total | 19,882 | 508.64 | 3.62 | 140.5 |
- SAIDI System Average Interruption Duration Index (minutes per customer per year)
- SAIFI System Average Interruption Frequency Index (interruptions per customer per year)
- CAIDI Customer Average Interruption Duration Index (minutes per customer interrupted)
On Monday 7 November 1994 an abnormal wind storm was experienced which resulted in widespread disruption of the electricity supply. Restoration to all customers affected was achieved on Monday 14 November 1994. Due to the emergency nature of this situation and to the extent of the damage caused by the storm, priority was given to the restoration of supply and as a result records of interruption information could not be kept. The reliability figures shown above are thus applicable to the period 1 April 1994 to 31 March 1995, excluding the week 7 to 14 November 1994.
The figures shown below includes our best estimate for the week 7 to 14 November 1994.
| Interruption Class | Number | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|
| A Planned Interruption by Trans Power | 2,726 | 56.92 | 0.50 | 114.5 |
| B Planned Interruption by Other Line Owner | 6,600 | 201.01 | 1.20 | 167.0 |
| C Unplanned Interruption by Other Line Owner | 12,648 | 1081.41 | 2.31 | 469.1 |
| D Unplanned Interruption by Trans Power | 298 | 0.27 | 0.05 | 5.0 |
| E Unplanned Interruption by ECNZ | ||||
| F Unplanned Interruption by any other generator | ||||
| G Unplanned Interruption not resulting from above | ||||
| Total | 22,272 | 1339.80 | 4.06 | 330.0 |
- 23 -
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 97
NZLII —
NZ Gazette 1995, No 97
β¨ LLM interpretation of page content
π
Notes to Financial Statements for Wairoa Power Limited
(continued from previous page)
π Trade, Customs & IndustryAccounting Policies, Financial Statements, Line Business, Wairoa Power Limited, Financial Performance, Efficiency Measures, Energy Delivery, Reliability Performance, Interruption Statistics, SAIDI, SAIFI, CAIDI