β¨ Electricity Reliability Performance Measures
6 SEPTEMBER NEW ZEALAND GAZETTE 2925
MAINPOWER NEW ZEALAND LTD
DISCLOSURE RELIABILITY PERFORMANCE MEASURES TO BE
DISCLOSED BY LINE OWNERS (OTHER THAN TRANS POWER)
PURSUANT TO REGULATION 16 AND PART IV OF THE FIRST
SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE)
REGULATIONS 1994
For The Year Ended 31 March 1995
- Total number of interruptions, together with a breakdown of that total according to interruption class.
| Interruption Class | Number of Interruptions |
|---|---|
| MainPower | |
| Planned Shut-Down | 257 |
| Unplanned Interruption | 359 |
| Trans Power | |
| Planned Shut-Down | 2 |
| Unplanned Interruption | 2 |
| Other | |
| Other Interruptions | 40 |
| Unplanned Interruption | Nil |
| Total Interruptions | 660 |
-
The total number of faults per 100 circuit kilometres of prescribed voltage electric line.
11.92 Faults
-
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km |
|---|---|
| 33 kV | 93.02 |
| 11 kV | 4.69 |
| TOTAL | 97.71 |
- The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km |
|---|---|
| 33 kV | 7.70 |
| 11 kV | 12.26 |
| TOTAL | 11.92 |
-
The SAIDI for the total of interruptions:
351.33
-
The SAIDI for the total number of interruptions within each interruption class:
| Network or Generation Owner | Classification | Minutes per Connected Customer |
|---|---|---|
| MainPower | Planned Shut-Down | 124.79 |
| Unplanned Interruption | 144.33 | |
| Trans Power | Planned Shut-Down | 4.91 |
| Unplanned Interruption | 58.61 | |
| Other | Other Interruptions | 18.69 |
| Unplanned Interruption | 00.00 |
-
The SAIFI for the total number of interruptions:
5.02
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 95
NZLII —
NZ Gazette 1995, No 95
β¨ LLM interpretation of page content
π
MainPower New Zealand Ltd Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI