✨ Energy Efficiency Report




2836

NEW ZEALAND GAZETTE

No. 93

  1. Disclosure of Energy Delivery Efficiency Performance Measures and Statistics pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994.

16.1 Energy delivery efficiency performance measures:

(a) Load factor 58.1%

(b) Loss Ratio 6.2 %

(c) Capacity Utilisation 32.1%
(Note transformer capacity as defined in Statistics below)

16.2 Statistics:

(a) System Length

33 kV system 273 km
11 kV system 1339 km
6.6 kV system 895 km
400 Volt system 1348 km

Total length 3855 km

(b) Overhead Line Length

33 kV system 266 km
11 kV system 1222 km
6.6 kV system 878 km
400 Volt system 1106 km

Total length 3472 km

(c) Underground Cable Length

33 kV system 7 km
11 kV system 117 km
6.6 kV system 17 km
400 Volt system 242 km

Total length 383 km



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 93


NZLII PDF NZ Gazette 1995, No 93





✨ LLM interpretation of page content

🏭 Taranaki Energy Limited Energy Delivery Efficiency Performance (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery Efficiency, Performance Measures, Statistics, Electricity, Information Disclosure