β¨ Performance Measures and Statistics
4 SEPTEMBER NEW ZEALAND GAZETTE 2817
PERFORMANCE MEASURES AND OTHER INFORMATION - PART IV
Regulation 16
Reliability Performance Measures to be Disclosed by Line
-
TOTAL NUMBER OF INTERRUPTIONS:
Class A 1
Class B 78
Class C 350
Class D 10
Class E 0
Class F 0
Class G 0
Total 439 -
TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM
Total 19
33kV 6
11kV 13
(This breakdown is an estimate) -
TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM OF UNDERGROUND CABLE
Total 4
11kV 4
(This breakdown is an estimate) -
TOTAL NUMBER OF FAULTS PER 100 CIRCUIT KM OF OVERHEAD LINE
Total 16
33kV 3
11kV 13
(This breakdown is an estimate) -
THE SAIDI FOR THE TOTAL OF INTERRUPTIONS
336
-
THE SAIDI FOR THE TOTAL NUMBER IF INTERRUPTIONS WITHIN EACH CLASS
Class A 37
Class B 82
Class C 203
Class D 11
Class E 0
Class F 0
Class G 0
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 93
NZLII —
NZ Gazette 1995, No 93
β¨ LLM interpretation of page content
π°
King Country Energy Limited Efficiency Performance Measures
(continued from previous page)
π° Finance & RevenueEfficiency, Performance Measures, Energy Delivery, Statistics, King Country Energy Limited, Reliability, Interruptions, Faults