β¨ Electricity Performance Statistics
2768 NEW ZEALAND GAZETTE No. 91
TOP ENERGY LIMITED
Performance Measures And Statistics (cont)
4. STATISTICS
Statistics pursuant to Regulation 15 and Part III, Clause 2 of the First Schedule of the Electricity (Information Disclosure) Regulations 1994 are:
| 400V | 11kV | 33kV | Total | |
|---|---|---|---|---|
| (a) System length (in kilometres) | 1301 | 3048 | 239 | 4588 |
| (b) Total circuit length (in kilometres) of overhead electric lines. | 885 | 3015 | 239 | 4139 |
| (c) Total circuit length (in kilometres) of underground electric cables. | 416 | 33 | - | 449 |
(d) Transformer capacity (in kilovolt amperes).
142,000
(e) Maximum demand (in kilowatts).
46,190
(f) Total electricity supplied from the system (in kilowatt hours).
235,000,000
(g) Total amount of electricity (in kilowatt hours) conveyed on behalf of other persons, that are electricity retailers or generators, not in a prescribed business relationship with Top Energy Limited.
(h) Total customers (average)
25,339
5. RELIABILITY PERFORMANCE MEASURES
Reliability Performance Measures pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994 are:
Interruptions
(a) Total number of interruptions, together with a breakdown of that total according to class.
Class A: Planned Trans Power interruption
0
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 91
NZLII —
NZ Gazette 1995, No 91
β¨ LLM interpretation of page content
π°
Financial and Efficiency Performance Measures for Top Energy Limited
(continued from previous page)
π° Finance & RevenueFinancial Performance, Efficiency Measures, Electricity, Energy Delivery, Top Energy Limited
πΎ Top Energy Limited Statistics and Reliability Performance Measures
πΎ Primary Industries & ResourcesElectricity, System Length, Transformer Capacity, Maximum Demand, Reliability Performance