✨ Electricity Performance Statistics




2768 NEW ZEALAND GAZETTE No. 91

TOP ENERGY LIMITED

Performance Measures And Statistics (cont)

4. STATISTICS

Statistics pursuant to Regulation 15 and Part III, Clause 2 of the First Schedule of the Electricity (Information Disclosure) Regulations 1994 are:

400V 11kV 33kV Total
(a) System length (in kilometres) 1301 3048 239 4588
(b) Total circuit length (in kilometres) of overhead electric lines. 885 3015 239 4139
(c) Total circuit length (in kilometres) of underground electric cables. 416 33 - 449

(d) Transformer capacity (in kilovolt amperes).

142,000

(e) Maximum demand (in kilowatts).

46,190

(f) Total electricity supplied from the system (in kilowatt hours).

235,000,000

(g) Total amount of electricity (in kilowatt hours) conveyed on behalf of other persons, that are electricity retailers or generators, not in a prescribed business relationship with Top Energy Limited.

(h) Total customers (average)

25,339

5. RELIABILITY PERFORMANCE MEASURES

Reliability Performance Measures pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994 are:

Interruptions

(a) Total number of interruptions, together with a breakdown of that total according to class.

Class A: Planned Trans Power interruption

0



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 91


NZLII PDF NZ Gazette 1995, No 91





✨ LLM interpretation of page content

πŸ’° Financial and Efficiency Performance Measures for Top Energy Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Performance, Efficiency Measures, Electricity, Energy Delivery, Top Energy Limited

🌾 Top Energy Limited Statistics and Reliability Performance Measures

🌾 Primary Industries & Resources
Electricity, System Length, Transformer Capacity, Maximum Demand, Reliability Performance