β¨ Electricity Reliability Statistics
2584 NEW ZEALAND GAZETTE No. 89
-
SAIDI for the total number interruptions within each interruption class.
Class B - planned interruptions by Electro Power
- 0.425 minutes/connected customer/year
Class C - unplanned interruptions by Electro Power
- 18.032 minutes/connected customer/year
Class D - unplanned interruptions by TransPower
- 13.036 minutes/connected customer/year
-
SAIFI for the total number of interruptions.
- 1.159 interruptions/connected customer/year
-
SAIFI for the total number of interruptions within each interruption class.
Class B - planned interruptions by Electro Power
- 1.159 interruptions/connected customer/year
Class C - unplanned interruptions by Electro Power
- .007 interruptions/connected customer/year
Class D - unplanned interruptions by TransPower
- .604 interruptions/connected customer/year
-
CAIDI for the total of all interruptions.
- 27.172 minutes/customer interrupted
-
CAIDI for the total number of interruptions within each class.
Class B - planned interruptions by Electro Power
- 60.0 minutes/customer interrupted
Class C - unplanned interruptions by Electro Power
- 32.907 minutes/customer interrupted
Class D - unplanned interruptions by TransPower
- 21.583 minutes/customer interrupted
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 89
NZLII —
NZ Gazette 1995, No 89
β¨ LLM interpretation of page content
π
Energy Delivery Efficiency Performance Measures and Statistics for Electro Power Limited
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Statistics