✨ Electricity Reliability Statistics




2584 NEW ZEALAND GAZETTE No. 89

  1. SAIDI for the total number interruptions within each interruption class.

    Class B - planned interruptions by Electro Power

    • 0.425 minutes/connected customer/year

    Class C - unplanned interruptions by Electro Power

    • 18.032 minutes/connected customer/year

    Class D - unplanned interruptions by TransPower

    • 13.036 minutes/connected customer/year
  2. SAIFI for the total number of interruptions.

    • 1.159 interruptions/connected customer/year
  3. SAIFI for the total number of interruptions within each interruption class.

    Class B - planned interruptions by Electro Power

    • 1.159 interruptions/connected customer/year

    Class C - unplanned interruptions by Electro Power

    • .007 interruptions/connected customer/year

    Class D - unplanned interruptions by TransPower

    • .604 interruptions/connected customer/year
  4. CAIDI for the total of all interruptions.

    • 27.172 minutes/customer interrupted
  5. CAIDI for the total number of interruptions within each class.

    Class B - planned interruptions by Electro Power

    • 60.0 minutes/customer interrupted

    Class C - unplanned interruptions by Electro Power

    • 32.907 minutes/customer interrupted

    Class D - unplanned interruptions by TransPower

    • 21.583 minutes/customer interrupted


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 89


NZLII PDF NZ Gazette 1995, No 89





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics for Electro Power Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Statistics