✨ Electricity Performance Measures




25 AUGUST NEW ZEALAND GAZETTE 2511

Regulation 15 - Disclosure by line owners of energy delivery efficiency performance measures and statistics

  1. (a) Load factor 53.5%
    (b) Loss ratio 4.7%
    (c) Capacity utilisation 36.1%

  2. (a) Sum of overhead and underground line circuit lengths:

    Description Average (km)
    66kV 115
    33kV 322
    11kV 4,672
    230/400V 2,668
    230V Outside Lighting 1,712
    Communications 959
    Totals 10,448

    (b) Overhead line circuit lengths:

    Description Average (km)
    66kV 57
    33kV 310
    11kV 2,949
    230/400V 1,537
    230V Outside Lighting 1,001
    Totals 5,854

    (c) Underground line (cable) circuit lengths:

    Description Average (km)
    66kV 58
    33kV 12
    11kV 1,723
    230/400V 1,131
    230V Outside Lighting 711
    Communications 959
    Totals 4,594


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 86


NZLII PDF NZ Gazette 1995, No 86





✨ LLM interpretation of page content

🏭 Electricity Information Disclosure Regulations 1994 (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, Line Circuit Lengths, Overhead Lines, Underground Lines