β¨ Electricity Performance Measures
25 AUGUST NEW ZEALAND GAZETTE 2511
Regulation 15 - Disclosure by line owners of energy delivery efficiency performance measures and statistics
-
(a) Load factor 53.5%
(b) Loss ratio 4.7%
(c) Capacity utilisation 36.1% -
(a) Sum of overhead and underground line circuit lengths:
Description Average (km) 66kV 115 33kV 322 11kV 4,672 230/400V 2,668 230V Outside Lighting 1,712 Communications 959 Totals 10,448 (b) Overhead line circuit lengths:
Description Average (km) 66kV 57 33kV 310 11kV 2,949 230/400V 1,537 230V Outside Lighting 1,001 Totals 5,854 (c) Underground line (cable) circuit lengths:
Description Average (km) 66kV 58 33kV 12 11kV 1,723 230/400V 1,131 230V Outside Lighting 711 Communications 959 Totals 4,594
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 86
NZLII —
NZ Gazette 1995, No 86
β¨ LLM interpretation of page content
π
Electricity Information Disclosure Regulations 1994
(continued from previous page)
π Trade, Customs & IndustryElectricity, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, Line Circuit Lengths, Overhead Lines, Underground Lines