1. Financial Performance Measures
(a) Accounting return on total assets: 2.0%
(b) Accounting return on equity: 0.8%
(c) Accounting rate of profit: 2.8%
2. Efficiency performance measures
(a) Direct line costs per kilometre: $1,247 / km
(b) Indirect line costs per electricity customer: $32 / customer
DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
1. Energy Delivery Efficiency Performance Measures
(a) Load Factor: 58.9%
(b) Loss Ratio: 6.8%
(c) Capacity Utilisation: 25.2%
2. Statistics
| Network Length | Overhead (b) | Underground (c) | Total (a) |
|---|---|---|---|
| 33kV | 248 km | 3 km | 251 km |
| 11kV | 1,723 km | 47 km | 1,770 km |
| 400 V | 120 km | 83 km | 203 km |
| TOTAL | 2,091 km | 133 km | 2,224 km |
(d) Distribution transformer capacity: 194,569 kVA
(e) Maximum demand: 49,047 kW
(f) Total electricity supplied from Network: 235,757,754 kWh
(g) Total electricity conveyed for other persons: 0 kWh
(h) Total customers: 12,915
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
1. Total number of interruptions
| Number of Interruptions | |
|---|---|
| B - planned by line owner | 217 |
| C - unplanned by line owner | 225 |
| D - unplanned by Trans Power | 4 |
| A, E, F + G | 0 |
| TOTAL | 446 |
2. Total number of faults per 100 circuit kilometres of prescribed voltage electric line
| TOTAL | 11.13 |
| 33kV | 2.39 |
| 11kV | 12.37 |
3. Total number of faults per 100 circuit kilometres of underground prescribed voltage electric line
| TOTAL | 2.00 |
| 33kV | - |
| 11kV | 2.14 |
4. Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line
| TOTAL | 11.36 |
| 33kV | 2.42 |
| 11kV | 12.65 |
5. The SAIDI for the total of interruptions
249.11
6. The SAIDI within each interruption class
| Class | SAIDI |
|---|---|
| B - planned by line owner | 58.22 |
| C - unplanned by line owner | 126.65 |
| D - unplanned by Trans Power | 64.24 |
| A, E, F + G | 0.00 |
7. The SAIFI for the total number of interruptions
2.21
8. The SAIFI within each interruption class
| Class | SAIFI |
|---|---|
| B - planned by line owner | 0.29 |
| C - unplanned by line owner | 1.09 |
| D - unplanned by Trans Power | 0.83 |
| A, E, F + G | 0.00 |
9. The CAIDI for the total of all interruptions
112.72
10. The CAIDI within each interruption class
| Class | CAIDI |
|---|---|
| B - planned by line owner | 200.76 |
| C - unplanned by line owner | 116.19 |
| D - unplanned by Trans Power | 77.40 |
| A, E, F + G | 0.00 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 84
NZLII —
NZ Gazette 1995, No 84
β¨ LLM interpretation of page content
π
Electricity Ashburton Limited - Line Business Activity Performance Measures and Statistics
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, Efficiency Measures, Energy Delivery, Network Length, Distribution Transformer, Reliability Measures