β¨ Electricity Performance Measures
18 AUGUST NEW ZEALAND GAZETTE 2327
Disclosure of Reliability of Performance Measures
Pursuant to Regulation 16 Electricity (Information Disclosure) Regulations 1994
-
Interruptions (excluding interruptions caused by operation of 11kV transformer
fuses and affecting only up to 3 customers)Class Number Total all interruptions 594 A. TransPower - Planned Shutdowns 0 B. Electricity Distributor - Planned Shutdowns 290 C. Electricity Distributor - Unplanned Cuts 300 D. TransPower - Unplanned Cuts 4 E. ECNZ Generator - Unplanned Cuts 0 F. Other Distributor or Generator - Unplanned Cuts 0 G. Other Distributor or Generator - Planned Shutdowns 0 -
Total faults per 100 kilometres: 12.1
-
Underground faults per 100km
Total all voltages:
33kV 33.3
22kV 0
11kV 33.3 -
Overhead faults per 100km
Total all voltages:
33kV 10.0
22kV 8.3
11kV 12.3 -
System performance indices
Class (As in 1. above) SAIDI (System Average Interruption Duration Index) SAIFI (System Average Interruption Frequency Index) CAIDI (Customer Average Interruption Duration Index) A. 0 0 - B. 398.7 1.52 262.33 C. 468.8 7.59 61.77 D. 18.8 0.47 40.04 E. 0 0 - F. 0 0 - G. 0 0 - Total 886.4 9.59 92.43
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 82
NZLII —
NZ Gazette 1995, No 82
β¨ LLM interpretation of page content
π Disclosure of Reliability of Performance Measures
π Trade, Customs & IndustryElectricity, Performance Measures, Interruptions, Faults, System Performance