✨ Energy Efficiency Performance Measures




2318
NEW ZEALAND GAZETTE
No. 82

DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

  1. Energy delivery efficiency performance measures
    (a) Load factor 64.54%
    (b) Loss ratio 5.32%
    (c) Capacity utilisation 43.25%

  2. Statistics
    (a) System length, broken down by voltage
    33 kV 189.5 km
    11 kV 3,463.6 km
    400 v 1,535.7 km
    Total 5,188.8 km

    (b) Circuit length of overhead lines, broken down by voltage
    33 kV 177.3 km
    11 kV 3,402.3 km
    400 v 1,417.5 km
    Total 4,997.1 km

    (c) Circuit length of underground cables, broken down by voltage
    33 kV 12.2 km
    11 kV 61.3 km
    400 v 118.2 km
    Total 191.7 km

    (d) Transformer capacity 305,091 kVa

    (e) Maximum demand 131,923 kW

    (f) Total electricity supplied from the system = 706,215,792 kWh

    (g) Total electricity conveyed through the
    system for other retailers = Nil

    (h) Total customers 42,557



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 82


NZLII PDF NZ Gazette 1995, No 82





✨ LLM interpretation of page content

🏭 Disclosure of Energy Efficiency Performance Measures and Statistics for Electricity

🏭 Trade, Customs & Industry
Energy delivery efficiency, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supply, Customers